Friedrich & ClementBETA

T082002-T063002-T140002 - Wetserlo, Turnhout & Tervuren, RTC measurement EWOS

T082002-T063002-T140002 - Wetserlo, Turnhout & Tervuren, RTC meting EWOS

Belgium · how to bid here →

Your path to submission

  1. Deadline: 10 November at 11:00 — 38 days left.
  2. You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 0% of this buyer's awards went to companies that had already won here before (15 awards since 2022, spread over 4 companies). That is well below the sector norm (14%) — this buyer switches suppliers more often than others.n = 15 awards since 2022
  • The median procedure drew 3 bids (10 procedures with a bid count); 30% ended with a single bidder. Sector: median 4 bids.n = 10
  • 13% of awards went to companies from abroad (15 awards with a known winner country). Sector average: 10%.n = 15

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Belgium · Construction work, 233 contracts went to foreign companies over the last 3 years (of 2,587 recorded awards) — mostly from France, Germany, Netherlands.

Typical field: median 4 (from 1,496 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

T082002-T063002-T140002 - Wetserlo, Turnhout & Tervuren, RTC measurement EWOS. At RWZI Westerlo, Turnhout and Tervuren an RTC (Real time Control) control is provided on the RBT (Rain settler tank) to make optimal use of the storage in the system. For this purpose, a level measurement must be placed at the level of the EWOS of the WWTPs. This mainly includes the following works: - Supply and place radar measurement with bracket in the overflow construction. - Supply and install cables including earthworks and core drilling. - Construct and install electrical cabinet including polyester outer cabinet. - Assistance with grid connection by Fluvius and commissioning by Aquafin

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerAquafin NV - Directie Projectmanagement
TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published24 September 2026
CategoryConstruction work · CPV 45252130

Who has won here before

CompanyAwardsPeriod
Deckx Algemene Ondernemingen12022
Smet GWT Europe12022
Mols Contractors12022
Colas Noord12022
From 17.9M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20225
2024408
2025391
2026413

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 10 November at 11:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on BDA / e-Procurement Belgium. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →