RIOT3003 - Kortrijk, Riothermie Bleachery Site
RIOT3003 - Kortrijk, Riothermie Blekerijsite
Belgium · how to bid here →
Your path to submission
- Deadline: 6 November at 10:00 — 34 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (15 awards since 2022, spread over 4 companies). That is well below the sector norm (14%) — this buyer switches suppliers more often than others.n = 15 awards since 2022
- The median procedure drew 3 bids (10 procedures with a bid count); 30% ended with a single bidder. Sector: median 4 bids.n = 10
- 13% of awards went to companies from abroad (15 awards with a known winner country). Sector average: 10%.n = 15
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Belgium · Construction work, 233 contracts went to foreign companies over the last 3 years (of 2,587 recorded awards) — mostly from France, Germany, Netherlands.
Typical field: median 4 (from 1,498 awards).
What the buyer is looking for
RIOT3003 - Kortrijk, Riothermie Blekerijsite. The assignment consists of the supply, installation, commissioning and maintenance of a riothermal heat exchanger for the Ever project in Kortrijk in the existing collector diam 800 from Aquafin. The assignment also includes the temporary water management in order to be able to carry out the heat exchanger in a dry collector. Extra attention is required for safe execution. A collector with diameter 800mm is not man-accessible according to the guidelines of Aquafin. The drawing up of a risk analysis and an action plan for safe implementation is an award criterion.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Deckx Algemene Ondernemingen | 1 | 2022 |
| Colas Noord | 1 | 2022 |
| Smet GWT Europe | 1 | 2022 |
| Mols Contractors | 1 | 2022 |