EDR – Setting up and organizing access control for the execution of WP9.2
EDR – Het inrichten en organiseren van een toegangscontrole voor het uitvoeren van WP9.2
Belgium · how to bid here →
Your path to submission
- Deadline: 4 November at 10:00 — 32 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (14 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to S.B.E. nv.n = 14
- The median procedure drew 3 bids (85 procedures with a bid count); 21% ended with a single bidder. Sector: median 5 bids.n = 85
- 6% of this buyer's awards went to companies that had already won here before (95 awards since 2022, spread over 77 companies). 94% went to new names.n = 95 awards since 2022
- 25% of awards went to companies from abroad (95 awards with a known winner country). Sector average: 29%.n = 95
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Belgium · Business services, 721 contracts went to foreign companies over the last 3 years (of 3,078 recorded awards) — mostly from France, Germany, Italy.
Typical field: median 4 (from 14 awards).
What the buyer is looking for
The purpose of the assignment is to set up and organize an access control for the execution of the work packages WP9.2 - WP9.2.ACEF: renovation DD3 and DD4 + Kaaimuur ND1 + site construction - WP9.2B: construction caaimuur + construction buffer basin + damping DD1 and damping DD2 - WP9.2D: demolition works sewerage, utilities and superstructure In general, this assignment includes the following: - supply, installation and organisation of access control via a temporary site access in accordance with the procedure and requirements associated with an ISPS zone - supply, installation and maintenance of a temporary fence to prevent unregistered access to the ISPS zone (EDR site) - supply, installation and maintenance of temporary signalling of access control to the site zone - rental of the facilities necessary for access control, closures, signalling, etc. for a long period of time
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Rental Pumps België B.V.B.A. | 2 | 2024–2025 |
| G4S SECURE SOLUTIONS nv | 2 | 2024 |
| ISS Facility Services | 2 | 2024 |
| S.B.E. NV | 2 | 2024–2026 |
| Ethias NV | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.