Framework agreement for study assignments for bridge replacement projects
Raamovereenkomst voor studieopdrachten voor brugvervangingsprojecten
Belgium · how to bid here →
Your path to submission
- Deadline: 23 October at 13:00 — 18 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (14 awards since 2022, spread over 4 companies). That is well below the sector norm (17%) — this buyer switches suppliers more often than others.n = 14 awards since 2022
- 7% of awards went to companies from abroad (14 awards with a known winner country). Sector average: 29%.n = 14
- The median procedure drew 4 bids (9 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Belgium · IT services, 521 contracts went to foreign companies over the last 3 years (of 2,089 recorded awards) — mostly from France, Germany, Luxembourg.
Typical field: median 5 (from 1,427 awards).
What the buyer is looking for
The contract is a framework contract and mainly includes: - Design of bridges (test program, stability technical, foundation, substructure, superstructure, …); - Preparation of necessary studies and documents for obtaining the environmental permit for these bridge designs The services include (not exhaustive): - preparation of the start and / or project note and evaluation note - measurement of the existing situation - preparation of the complete road map file - preparation of the complete bridge design file - attendance and support at information sessions to the public - preparation of the tender bundle - preparation of the file for applying for the environmental permit and any other permit applications - preparation of any expropriation plans For a detailed description of the subject matter of the contract, reference is made to the technical provisions. Lots / Lots: The contract is a…
Show full description
… framework contract and mainly includes: - Design of bridges (test program, stability technical, foundation, substructure, superstructure, …); - Preparation of necessary studies and documents for obtaining the environmental permit for these bridge designs The services include (not exhaustive): - preparation of the start and / or project note and evaluation note - measurement of the existing situation - preparation of the complete road map file - preparation of the complete bridge design file - attendance and support at information sessions for the public - preparation of the tender bundle - preparation of the file for applying for the environmental permit and any other permit applications - preparation of any expropriation plans For a detailed description of the subject matter of the contract, reference is made to the technical provisions
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| BVBA ADEDE | 1 | 2022 |
| Samenwerkende Organisatie van Gespecialiseerde Aannemers | 1 | 2022 |
| Willemen Infra NV | 1 | 2022 |
| ABOG NV | 1 | 2022 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.