Renovation works of the Control Command of the Ronquières inclined plane and complementary systems to it.
Travaux de rénovation du Contrôle Commande du plan incliné de Ronquières et de systèmes complémentaires à celui-ci.
Belgium · Namur · how to bid here →
Your path to submission
- Deadline: 14 October 2027 at 09:00 — 372 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, FRA, FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (32 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to AELTERMAN.n = 32
- The award came in at a median 38% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 5
- 27% of this buyer's awards went to companies that had already won here before (315 awards since 2021, spread over 225 companies). That is well above the sector norm (14%) — newcomers have a harder time here than elsewhere.n = 315 awards since 2021
- The median procedure drew 5 bids (287 procedures with a bid count); 8% ended with a single bidder. Sector: median 4 bids.n = 287
- 18% of awards went to companies from abroad (315 awards with a known winner country). Sector average: 11%.n = 315
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.
Foreign bidders
In Belgium · Construction work, 234 contracts went to foreign companies over the last 3 years (of 2,596 recorded awards) — mostly from France, Germany, Italy.
Submission language: FRA.
Typical field: median 5 (from 30 awards).
What the buyer is looking for
Rénovation du Contrôle commande et de système associés · Entretien des moteurs d'entraînement des bacs · Système de caméras
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ENTREPRISE LOUIS BAUDOIN | 8 | 2024 |
| SOCOGETRA | 6 | 2024–2025 |
| Krinkels | 5 | 2024–2026 |
| Sweco Belgium | 4 | 2023–2024 |
| Au Bleu Sarrau | 4 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.