PROJECTEN_AANSTELLING ONTWERPER_ontwerp en opvolging sloop en vervangingsbouw 6 woningen - 4 WE Sint-Jozefslaan en 2 WE Paviljoenstraat te Mol_WiV 1290/2026/0484/01_ID3100
Belgium · how to bid here →
Your path to submission
- Deadline: 20 October at 10:00 — 31 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 11 months (6 awards, most recently July 2026) — the next award is due around June 2027 by that rhythm. The last award went to West Architectuur.n = 6
- 11% of this buyer's awards went to companies that had already won here before (20 awards since 2023, spread over 15 companies). 89% went to new names.n = 20 awards since 2023
- 5% of awards went to companies from abroad (20 awards with a known winner country). Sector average: 16%.n = 20
- The median procedure drew 5 bids (19 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 19
- Across 3 procedures with structured selection criteria, this buyer most often required: References: services (3 of 3), Professional liability insurance (1 of 3).n = 3
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Belgium · Architecture & engineering, 265 contracts went to foreign companies over the last 3 years (of 2,100 recorded awards) — mostly from France, Germany, Netherlands.
Typical field: median 8 (from 6 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (NL).
Show original description (NL)
Woonboog wenst voor haar project te Mol een ontwerper aan te stelen die verantwoordelijk is voor de opmaak van een ontwerp alsook de volledige opvolging en coördinatie van de werken voor: De sloop en vervangingsbouw van 6 woningen te Mol: 4 woningen in de Sint -Jozefslaan en 2 woningen in de Paviljoenstraat. Het sloopdossier van 6 woningen te Mol.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Tijdelijke Maatschap Recon Bouw NV-Bouwbedrijf WienenNV | 2 | 2024–2026 |
| Architects in Motion bv | 2 | 2024–2025 |
| TM Lamers - Haex | 1 | 2024 |
| Van Hemelen Guido | 1 | 2024 |
| West Architectuur | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.