Preparatory analyses and modelling for waterway management procedures
Voorbereidende analyses en modelleringen voor procedures vaarwegbeheer
Belgium · how to bid here →
Your path to submission
- Deadline: 6 October at 10:00 — 2 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (7 awards, most recently August 2022) — by that rhythm the next award was due around October 2022. The last award went to Witteveen+Bos Belgium NV.n = 7
- The median procedure drew 3 bids (24 procedures with a bid count); 33% ended with a single bidder. Sector: median 5 bids.n = 24
- 3% of this buyer's awards went to companies that had already won here before (38 awards since 2015, spread over 12 companies). 97% went to new names.n = 38 awards since 2015
- 11% of awards went to companies from abroad (38 awards with a known winner country). Sector average: 16%.n = 38
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Belgium · Architecture & engineering, 270 contracts went to foreign companies over the last 3 years (of 2,118 recorded awards) — mostly from France, Germany, Netherlands.
Typical field: median 5 (from 1,254 awards).
What the buyer is looking for
This contract provides support according to the Capacity-as-a-Service (CAAS) model for a period of two years with a possible extension for a further two years. This model offers a flexible deployment of specialized capacity, where support is provided at the time it is needed, without having to estimate in advance exactly how much work or deployment will be required. It is particularly suitable for tasks where the size and timing are difficult to predict, and where it is essential that technical tools, databases and models are kept permanently up-to-date or prepared for rapid deployment.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Arcadis Belgium NV | 2 | 2015 |
| Seco Belgium nv | 1 | 2022 |
| Segro | 1 | 2015 |
| TM Artes Roegiers - De Meyer | 1 | 2022 |
| IRIS | 1 | 2015 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.