A0188007 - Wichelen, installation of adapted lifting equipment
A0188007 - Wichelen, plaatsen aangepaste hijsvoorzieningen
Belgium · how to bid here →
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (15 awards since 2022, spread over 4 companies). That is well below the sector norm (14%) — this buyer switches suppliers more often than others.n = 15 awards since 2022
- The median procedure drew 3 bids (10 procedures with a bid count); 30% ended with a single bidder. Sector: median 4 bids.n = 10
- 13% of awards went to companies from abroad (15 awards with a known winner country). Sector average: 11%.n = 15
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Belgium · Construction work, 234 contracts went to foreign companies over the last 3 years (of 2,596 recorded awards) — mostly from France, Germany, Italy.
Typical field: median 4 (from 1,507 awards).
What the buyer is looking for
A0188007 - Wickets, places custom lifting facilities. In general, the OD considers the installation and expansion of drives, motors and pumps in the various buildings on the WWTP (Sludge storage and sludge return building) to be very difficult in terms of ergonomics and safety. There are not enough resources available at the two locations concerned. This results in dangerous situations. It is proposed to build in openings in the roof so that ship hatches can be installed (to be opened from the inside) (sludge return building) in order to lift the devices directly through the roof by means of the truck crane of the OD. In addition, in order to be able to install the hatches, it is checked whether structural adjustments are needed. AS ALTERNATIVE for this building, it can be checked whether the side wall needs to be adjusted in order to be able to place a hoisting device (similar to the…
Show full description
… adjacent building). At the other location – sludge storage building - a wall swivel crane must be placed. It is investigated whether a kinked variant can be interesting to cover a larger working area. Lots / Lots: A0188007 - Wickets, places custom lifting facilities. In general, the OD considers the installation and expansion of drives, motors and pumps in the various buildings on the WWTP (Sludge storage and sludge return building) to be very difficult in terms of ergonomics and safety. There are not enough resources available at the two locations concerned. This results in dangerous situations. It is proposed to build in openings in the roof so that ship hatches can be installed (to be opened from the inside) (sludge return building) in order to lift the devices directly through the roof by means of the truck crane of the OD. In addition, in order to be able to install the hatches, it is checked whether structural adjustments are needed. AS ALTERNATIVE for this building, it can be checked whether the side wall needs to be adjusted in order to be able to place a hoisting device (by analogy with the adjacent building). A wall swivel crane must be installed at the other location – sludge storage building. It is investigated whether a kinked variant can be interesting to cover a larger working area.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Deckx Algemene Ondernemingen | 1 | 2022 |
| Smet GWT Europe | 1 | 2022 |
| Colas Noord | 1 | 2022 |
| Mols Contractors | 1 | 2022 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.