Development and analysis of methodologies under Articles 6.2 and 6.4 of the Paris Agreement
Le développement et l’analyse de méthodologies sous les Articles 6.2 et 6.4 de l’Accord de Paris
Belgium · Sint-Joost-ten-Node · how to bid here →
Your path to submission
- Deadline: 24 August 2027 at 10:00 — 324 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, FRA, ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 8 months (9 awards, most recently September 2026) — the next award is due around June 2027 by that rhythm. The last award went to Öko-Institut Consult GmbH.n = 9
- The median procedure drew 2 bids (61 procedures with a bid count); 41% ended with a single bidder. Sector: median 6 bids.n = 61
- 36% of awards went to companies from abroad (113 awards with a known winner country). Sector average: 56%.n = 113
- 6% of this buyer's awards went to companies that had already won here before (113 awards since 2015, spread over 57 companies). 94% went to new names.n = 113 awards since 2015
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Belgium · R&D services, 535 contracts went to foreign companies over the last 3 years (of 1,131 recorded awards) — mostly from Germany, France, Italy.
Submission language: NLD.
Typical field: median 2 (from 4 awards).
What the buyer is looking for
The purpose of this procurement is to provide specialized technical support for the development, analysis and evaluation of methodologies under Articles 6.2 and 6.4 of the Paris Agreement, with a view to contributing to the environmental integrity of the carbon credits generated under this framework.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch, French, English.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| INSTITUT DE CONSEIL ET D'ETUDES EN DEVELOPPEMENT DURABLE en abrégé "ICEDD" | 3 | 2024–2026 |
| Universiteit Gent | 2 | 2024 |
| Vlaamse Instelling voor Technologisch Onderzoek · Mol | 2 | 2024–2026 |
| CSL BEHRING | 2 | 2025 |
| Event Pilots | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.