Friedrich & ClementBETA

Stadt Rosenheim

Germany · 8 open tenders · 568 awards with a known winner

How to bid in this country: portals, deadlines, thresholds →

Purchasing rhythm

Tenders published per year — who knows the rhythm prepares before the notice appears.

2018194
2019177
202090
202176
2022105
2023107
2024336
2025275
2026229

Clement What the numbers say about this buyer

  • The award came in at a median 169% of the estimated value (10 awards with both estimate and value) — pricing at the estimate is usually too low here. Country: 86%.n = 10
  • 33% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Country: 75%.n = 5
  • 50% of this buyer's awards went to companies that had already won here before (499 awards since 2018, spread over 249 companies). 50% went to new names.n = 499 awards since 2018
  • The median procedure drew 3 bids (385 procedures with a bid count); 30% ended with a single bidder. Country: median 3.1 bids.n = 385
  • 8% of the bids received came from other countries (5 procedures with a bid mix) — all bidders, not just the winners. Country: 3%.n = 5
  • Across 19 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (19 of 19), Minimum annual headcount (18 of 19), Professional liability insurance (18 of 19), Professional register enrolment (16 of 19).n = 19
  • From notice to award takes a median 46 days here (17 procedures). Country: 86 days.n = 17

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 33% of 26,069 closed expectation windows produced a notice.

  • Oct 2026Cleaning, environment & waste
    about every 8 months · 14 awards · last Feb 2026 to Münchener Gebäudereinigung, K.E. Müller GmbH
  • Nov 2026Architecture & engineering
    about every 3 months · 53 awards · last Aug 2026 to LMJD Dennerle Motzet Architekten Part mbB
  • Dec 2026Construction work
    about every 2 months · 256 awards · last Oct 2026 to Schreinerei Lagler

Who has won here before

CompanyAwardsPeriod
Claus Heinemann Elektroanlagen GmbH332020–2022
Holzmaier Bau GmbH & Co. KG · Bad Endorf262019–2020
Elektro Maier GmbH · Kirchweidach212018–2025
BHN Metallbau GmbH & Co. KG · Nußdorf122018–2021
Rücker + Schindele Beratende Ingenieure GmbH112015–2023
Staudacher GmbH82018–2025
Hirsch GmbH · Konstanz82017–2024
KONE GmbH72019–2025
Huber & Co. GmbH · Rechtmehring72018–2022
Ing.-Büro Hartl72021–2024

From 18.4M documented awards · regular winners know this buyer's requirements — that is your competition.

New tenders from this buyer — in your inbox at 7:30 every morning.
Register now →