Friedrich & ClementBETA

SPEEH HIDROELECTRICA SA

Romania · 20 open tenders · 214 documented awards

Current tenders

AHE Movileni. Restoration of left bank profile km 1+750 (design and execution)
756.301 RONDeadline 6 Oct ·
AHE Cooling. Fix under-crossing counter-channel straight dam mal (design and execution)
2.391.391 RONDeadline 6 Oct ·
Update of Special Monitoring Projects for hydroelectric facilities under the administration of Hidroelectrica S.A.
BELOW THRESHOLDDeadline 7 Oct ·
Modernization of pump stations behind dikes within SH. Rm. Vâlcea: "SP Topolog from CHE Babeni, SP Bratia from CHE Babeni, SP Bistrita from CHE Babeni, SP Olanu from CHE Ionesti, SP Oltet from CHE Ipotesti, SP Poganu from CHE Strejesti, SP Teslui from CHE Arcesti, SP Teslui – Farcasele from CHE Draganesti"
43.107.318 RONDeadline 7 Oct ·
Repair (including upgrade) Vibration Monitoring and Air Gap Installation HA1, HA2 and HA3 / CHE Ciunget Monitoring Diagnosis System
2.218.828 RONDeadline 7 Oct ·
Rehabilitation in the servomotor factory spare parts for the emergency gate of the Lock PFII
689.796 RONDeadline 8 Oct ·
Works for reflooring the machinery room at CHE Scoreiu and CHE Vistea
BELOW THRESHOLDDeadline 8 Oct ·
Acquisition of cadastral services for the preparation of cadastral documentation necessary for updating land registers and recording geometry in eTerra 3 for 18 properties owned by SPEEH Hidroelectrica S.A
BELOW THRESHOLDDeadline 12 Oct ·
Alignment of supply pipeline CHE Vălenii de Munte
BELOW THRESHOLDDeadline 14 Oct ·
Retechnologization of C.H.E. Gogoșu
158.548.779 €Deadline 15 Oct ·
Procurement of civil liability insurance services for administrators, directors - members of the Supervisory Board and of the Board of Directors of S.P.E.E.H. HIDROELECTRICA S.A. (including chairpersons)
8.357.550 RONDeadline 19 Oct ·
Upgrading the pump stations behind the piers of SH. Rm. Vâlcea: ‘SP Topolog de la CHE Babeni, SP Bratia de la CHE Babeni, SP Bistrita de la CHE Babeni, SP Olanu de la CHE Ionești, SP Oltet de la CHE Ipotesti, SP Poganu de la CHE Strejesti, SP Teslui de la CHE Arcesti, SP Teslui – Farcasele de la CHE Drăgănești’
43.107.318 RONDeadline 19 Oct ·
Desilting works of HPP facilities administered and/or owned by HPP
BELOW THRESHOLDDeadline 20 Oct ·
Technical expertise for performing LN4D type works on the 50 tf cofferdam drive winch – Vidra Dam
BELOW THRESHOLDDeadline 26 Oct ·
Design services for installation of safety valves on ISCIR equipment
Deadline 26 Oct ·
Internal services transformations
Deadline 28 Oct ·
LOT 1 – Drive chains for segment gates with flap Topoliceni Dam LOT 2 – Drive chains for segment gates with flap Galbeni Dam, Racaciuni Dam and Beresti Dam
Deadline 28 Oct ·
LOT 1 – Lanturi actionare stavile segment cu clapet Baraj Topoliceni LOT 2 – Lanturi actionare stavile segment cu clapet Baraj Galbeni, Baraj Racaciuni si Baraj Beresti
4.024.704 RONDeadline 28 Oct ·
MAINTENANCE SERVICES FOR WARNING AND ALARM SYSTEMS
3.402.085 RONDeadline 2 Nov ·
Retehnologizare C.H.E. Gogoșu
158.548.779 €Deadline 9 Nov ·

Purchasing rhythm

Awards per year — who knows the rhythm prepares before the notice appears.

202111
202230
202336
2024445
2025567
2026303

Clement What the numbers say about this buyer

  • 31% of this buyer's awards went to companies that had already won here before (284 awards since 2021, spread over 126 companies). That is well below the national norm (76%) — this buyer switches suppliers more often than others.n = 284 awards since 2021
  • The median procedure drew 2 bids (235 procedures with a bid count); 31% ended with a single bidder. Country: median 5.3 bids.n = 235
  • 14% of awards went to companies from abroad (284 awards with a known winner country). National average: 1%.n = 284
  • The award came in at a median 87% of the estimated value (14 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 82%.n = 14
  • 79% of the bids received came from small and medium-sized enterprises (183 procedures with a bid mix). Country: 68%.n = 183
  • Across 23 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (17 of 23), Share of subcontractors (17 of 23), Independent quality certificate (e.g. ISO 9001) (15 of 23), References: services (12 of 23).n = 23
  • 4% of the bids received came from other countries (183 procedures with a bid mix) — all bidders, not just the winners. Country: 2%.n = 183

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 25% of 9,975 closed expectation windows produced a notice.

Who has won here before

CompanyAwardsPeriod
ASEE Solutions82024–2026
ORANGE ROMANIA82024–2026
S.C. ORANGE ROMANIA COMMUNICATIONS S.A.72024–2026
S.C. VODAFONE ROMANIA S.A. S.R.L.72024–2026
FOCALITY62024–2026
Gentec Data52024–2026
OMV PETROM MARKETING42024–2026
KPMG Audit S.R.L.42024–2025
ROTMARK SRL42024–2026
UNIQA ASIGURARI42022–2025

From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.