Secretaria Regional de Equipamentos e Infraestruturas
Portugal · 5 open tenders · 680 documented awards
Current tenders
VR1 - RAPID ROAD RIBEIRA BRAVA / MACHICO. REFORMULATION OF THE NODE OF HOLY ANNONYUM AND ACCESSES. SURVEILLANCE
538.596 €Deadline 6 Oct ·
CENTRAL AND UNIVERSITY HOSPITAL OF MADEIRA - 3RD PHASE - GENERAL INFRASTRUCTURE. FINISHES AND TECHNICAL INSTALLATIONS - A
415.000.000 €Deadline 13 Oct ·
STABILIZATION OF THE SLOPE AND PROTECTION OF VE2 BETWEEN THE LADEIRA DA VINHA AND JOÃO DELGADO TUNNELS - SECTION BETWEEN KM 3+600 AND 3+800. WORKS CONTRACT.
6.720.000 €Deadline 13 Oct ·
FORNECIMENTO E INSTALAÇÃO DE UM SISTEMA INTEGRADO DE VIDEOVIGILÂNCIA DE INCÊNDIOS FLORESTAIS
3.184.500 €Deadline 2 Nov ·
REGIONAL GOVERNMENT BUILDING AT CAMPO DA BARCA - ACQUISITION OF FOOD CONSUMPTION GOODS FOR THE CAFETERIA - 2026
122.597 €Deadline 2 Nov ·
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
201911
202085
2021140
202292
2023126
202471
2025161
2026117
Clement What the numbers say about this buyer
- The median procedure drew 4 bids (51 procedures with a bid count); 12% ended with a single bidder. Country: median 2.3 bids.n = 51
- 63% of this buyer's awards went to companies that had already won here before (721 awards since 2019, spread over 228 companies). 37% went to new names.n = 721 awards since 2019
- 48% of the bids received came from small and medium-sized enterprises (11 procedures with a bid mix). Country: 81%.n = 11
- The award came in at a median 87% of the estimated value (12 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 82%.n = 12
- 0% of the bids received came from other countries (11 procedures with a bid mix) — all bidders, not just the winners. Country: 2%.n = 11
- Not one of the 721 awards with a known winner country has gone to a foreign company so far. National average: 0%.n = 721
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Expected next awards
From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 25% of 9,975 closed expectation windows produced a notice.
- Aug 2026Construction work
about every 1 months · 27 awards · last Jul 2026 to TECNACO- TÉCNICOS DE CONSTRUÇÃO, S.A. - Oct 2026Architecture & engineering
about every 2 months · 12 awards · last Aug 2026 to CONSÓRCIO EXTERNO CONSTITUIDO PELAS SOCIEDADES: CONSULGAL , CONSULTORES DE ENGENHARIA E GESTÃO, S.A., e NRV MADEIRA - CONSULTORES DE ENGENHARIA, S.A., conforme contrato celebrado no dia 06/07/2026.
Who has won here before
| Company | Awards | Period |
|---|---|---|
| TECNOVIA - MADEIRA, SOCIEDADE DE EMPREITADAS, S.A. | 37 | 2020–2026 |
| AFAVIAS - Engenharia e Construções, S.A. | 34 | 2019–2026 |
| RIM - Engenharia e Construções, SA | 28 | 2020–2026 |
| Irmãos Leça de Freitas, Lda. | 22 | 2020–2026 |
| CONSULGAL - Consultores de Engenharia e Gestão, SA | 14 | 2019–2026 |
| TPF - CONSULTORES DE ENGENHARIA E ARQUITETURA, S.A. | 14 | 2020–2025 |
| JOSÉ AVELINO PINTO, CONSTRUÇÃO E ENGENHARIA, S.A. | 13 | 2019–2026 |
| Betoteste - Gabinete de Estudos de Geotecnia, Lda. | 10 | 2021–2023 |
| Pbuild, Unipessoal Lda | 10 | 2020–2026 |
| Jardins da Tabua, Lda | 10 | 2020–2026 |
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.