Friedrich & ClementBETA

Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.

Poland · 23 open tenders · 558 documented awards

Current tenders

Supply of self-propelled telescopic cranes within GPT equipment (procedure divided into 2 parts)
Deadline 8 Oct ·
Preparation of project documentation for the task: Gaz. Ołtaszyn Kudowa Jeleniów: liquidation and construction of new WTP Dolina and WTP Jordanów Śląski and elimination of galvanic short circuit in Jordanów Śląski.
Deadline 8 Oct ·
‘Performing in 2026-2030 5 comprehensive, annual service inspections of medium-voltage drives ROCKWELL located at the LNG Terminal in Świnoujście’
Deadline 9 Oct ·
Supply of self-propelled telescopic cranes as part of GPT equipment (procedure divided into 2 parts)
Deadline 9 Oct ·
Development of design documentation and performance of author's supervision for the task: "Gas. Wrocław Obw. Pd, odc. Ołtaszyn - ZZU Wysoka gas decommissioning and Gas. Wrocław Obw. Pd, odc. Ołtaszyn - ZZU Cargill - gas decommissioning"
Deadline 9 Oct ·
Service agreement of the Mars 100 + C51NH compressor unit with associated equipment - Kędzierzyn Koźle Gas Compressor Plant
Deadline 14 Oct ·
Opracowanie dokumentacji projektowej i pełnienie nadzoru autorskiego dla zadania: "Gaz. Wrocław Obw. Pd, odc. Ołtaszyn - ZZU Wysoka wyłączenie gaz. z eksploatacji oraz Gaz. Wrocław Obw. Pd, odc. Ołtaszyn - ZZU Cargill - wyłączenie gaz z eksploatacji"
Deadline 16 Oct ·
Construction supervision service, environmental supervision and investment implementation management for: "Construction of a DN700 gas pipeline, MOP 8.4 MPa to Kozienice Power Plant together with a gas station and accompanying infrastructure"
Deadline 16 Oct ·
Supply of 2 single-bucket tracked excavators
Deadline 16 Oct ·
Physical security service for persons and property provided in the form of direct protection and constant monitoring of alarm system signals from the facilities of Gas Transmission System Operator GAZ-SYSTEM S.A. Branch in Tarnów
Deadline 20 Oct ·
Diagnosis of gas pipelines with measuring pistons (order divided into 12 parts)
Deadline 20 Oct ·
Physical protection service for persons and property provided in the form of direct protection and continuous monitoring of alarm system signals from the facilities of Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A. Branch in Tarnów
Deadline 22 Oct ·
The subject matter of the Order is the successive delivery of vouchers for preventive meals for employees of GAZ-SYSTEM S.A.
Deadline 23 Oct ·
Preparation of design documentation for the reconstruction of gas pipeline DN100 to SP ZEC Jasło
Deadline 27 Oct ·
Preparation of design documentation for crossing the San River with a DN400/500 gas pipeline Lubaczów - Jarosław in Jarosław
Deadline 27 Oct ·
Implementation of consulting service entitled "Joint Commercial Analysis of the Nordic-Baltic Hydrogen Corridor"
Deadline 29 Oct ·
Delivery of brand new fast closing valves for natural gas in the pressure class of minimum PN 100 and/or CLASS600 together with the Current Service for Gas Transmission Operator GAZ-SYSTEM S.A. Branch in Poznań.
Deadline 2 Nov ·
Provision of construction services for investor supervision, environmental supervision and management of the implementation of the investment entitled: ‘Construction of the DN700, MOP 8.4 MPa gas pipeline to the Kozienice Power Plant together with a gas station and associated infrastructure’
Deadline 3 Nov ·
Development of project documentation for the task "Reconstruction of WG Strachocina (old)"
Deadline 3 Nov ·
Inspections of air-conditioning equipment in the Branch in Tarnów
Deadline 6 Nov ·
Provision of construction supervision service, environmental supervision and investment implementation management for the project: "Construction of DN 500 MOP 8.4 MPa gas pipeline in the Wola Karczewska-Karczew relation and construction of DN 400 8.4 MPa gas pipeline in the Karczew – Gassy relation Task 1 – section of DN 500 MOP 8.4 MPa gas pipeline Wola Karczewska-Karczew Task 2 - section of DN 400 8.4 MPa gas pipeline Karczew-Gassy"
Deadline 20 Nov ·
Provision of construction supervision service, environmental supervision and project implementation management for: "Construction of DN 500 MOP 8.4 MPa gas pipeline from Wola Karczewska to Karczew and construction of DN 400 8.4 MPa gas pipeline from Karczew to Gassy Task 1 – section of DN 500 MOP 8.4 MPa gas pipeline Wola Karczewska-Karczew Task 2 - section of DN 400 8.4 MPa gas pipeline Karczew-Gassy"
Deadline 27 Nov ·
Świadczenie usługi budowlanego nadzoru inwestorskiego, nadzoru przyrodniczego i zarządzania realizacją inwestycji pn.: „Budowa gazociągu DN 500 MOP 8,4 MPa relacji Wola Karczewska-Karczew i budowa gazociągu DN 400 8,4 MPa relacji Karczew – Gassy Zadanie 1 – odcinek gazociągu DN 500 MOP 8,4 MPa Wola Karczewska-Karczew Zadanie 2 - odcinek gazociągu DN 400 8,4 MPa Karczew-Gassy"
Deadline 11 Dec ·

Purchasing rhythm

Awards per year — who knows the rhythm prepares before the notice appears.

2018102
201968
202051
202147
202264
202365
2024347
2025398
2026335

Clement What the numbers say about this buyer

  • 22% of this buyer's awards went to companies that had already won here before (931 awards since 2015, spread over 352 companies). That is well below the national norm (39%) — this buyer switches suppliers more often than others.n = 931 awards since 2015
  • The median procedure drew 4 bids (748 procedures with a bid count); 16% ended with a single bidder. Country: median 2.2 bids.n = 748
  • 11% of awards went to companies from abroad (931 awards with a known winner country). National average: 5%.n = 931
  • Across 80 procedures with structured selection criteria, this buyer most often required: References: services (46 of 80), Staff qualifications (41 of 80), References: supplies (28 of 80), Equipment, plant and technical facilities (11 of 80).n = 80
  • 1% of the bids received came from other countries (97 procedures with a bid mix) — all bidders, not just the winners. Country: 2%.n = 97
  • 68% of the bids received came from small and medium-sized enterprises (97 procedures with a bid mix). Country: 65%.n = 97

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 26% of 11,200 closed expectation windows produced a notice.

Who has won here before

CompanyAwardsPeriod
Górnośląska Pracownia Projektowa Sp. z o.o.142025–2026
Wiertconsulting Sp. z o.o.112015–2025
TECHCOM Projekt Sp. z o.o.102024–2026
Waldemar Klimko usługi102024–2026
Gas-Engineering Jerzy Heider92015–2025
GAZOMET Sp. z o.o.82024–2026
Biuro Studiów i Projektów Gazownictwa GAZOPROJEKT S.A.82015
IZOSTAL S.A.82015–2026
BENDS and WELDS International Products GmbH72023–2026
FERRUM S.A.72023–2025

From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.