Die Autobahn GmbH des Bundes - NL Rheinland
Germany · 44 open tenders · 592 documented awards
Current tenders
A44, AS KR-Forstwald-AK Meerb., New construction LWL, 1.BA
Deadline 8 Oct ·
A44, AS KR-Forstwald-AK Meerb., New Construction LWL, 1st Construction Phase
Deadline 8 Oct ·
Replacement new construction 4907 907 incl. demolition existing building (K36)
Deadline 13 Oct ·
Replacement new construction 4907 907 incl. demolition of existing building (K36)
Deadline 13 Oct ·
External BÜ ENB BW Ruhr Bridge
Deadline 14 Oct ·
External contract management ENB BW Ruhr Bridge
Deadline 14 Oct ·
A3, 2. BA Grundh. Ern. zw. DIN-Hünxe Lot Traffic Safety
Deadline 20 Oct ·
Design and realisation competition for A 46 design planning ENB Rhine bridge Flehe (engineering structures/structural planning) including demolition concept
Deadline 20 Oct ·
A3, 2. BA Grundh. Ern. zw. DIN-Hünxe Lot Traffic Safety
Deadline 20 Oct ·
A3, 2. BA Basic Nutrition between DIN-Hünxe Lot FRS
Deadline 20 Oct ·
Design and realization competition for A 46 design planning ENB Rhine Bridge Flehe (engineering structures/structural planning) incl. demolition concept
Deadline 20 Oct ·
A3, 2. BA Basic Nutrition between DIN-Hünxe Lot FRS
Deadline 20 Oct ·
A4/L136 Construction Management and On-Site Supervision for KIB and Traffic Facilities
Deadline 27 Oct ·
A4/L136 Construction Management and Local Construction Supervision for KIB and Traffic Facilities
Deadline 27 Oct ·
Locking system at AM St. Augustin
BELOW THRESHOLDDeadline 28 Oct ·
A59, St Augustin, Environmental specialist services for preliminary planning
Deadline 29 Oct ·
A59, St Augustin, Environmental specialist services for preliminary planning
Deadline 29 Oct ·
A59, St Augustin, Environmental specialist services for preliminary planning
Deadline 29 Oct ·
A565 Millipede, 1st building lot: makeshift side position
Deadline 2 Nov ·
A565 Centipede, 1st Construction Phase: Temporary Side Storage
Deadline 2 Nov ·
A46, conversion AK W.-Sonnborn, environmental construction support
Deadline 3 Nov ·
A46, conversion AK W.-Sonnborn, environmental construction support
Deadline 3 Nov ·
A59, BIM management and overall BIM coordination
Deadline 3 Nov ·
A46, Conversion AK W.-Sonnborn, SiGeKo services
Deadline 3 Nov ·
A46, Conversion AK W.-Sonnborn, SiGeKo services
Deadline 3 Nov ·
A59, BIM management and overall BIM coordination
Deadline 3 Nov ·
Ext. Unterstützung Nachtragsmanagement AS Köln
Deadline 4 Nov ·
Ext. Support Supplementary Management AS Cologne
Deadline 4 Nov ·
A59, 2. Baulos Connection Areas Berliner Brücke West
Deadline 13 Nov ·
A59, 2. Baulos Connection Areas Berliner Brücke West
Deadline 13 Nov ·
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
2023100
20241,089
20251,042
2026899
Clement What the numbers say about this buyer
- 67% of this buyer's awards went to companies that had already won here before (580 awards since 2023, spread over 187 companies). That is well above the national norm (45%) — newcomers have a harder time here than elsewhere.n = 580 awards since 2023
- The median procedure drew 3 bids (569 procedures with a bid count); 35% ended with a single bidder. Country: median 3.1 bids.n = 569
- Across 63 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (61 of 63), Share of subcontractors (61 of 63), Technical staff for execution (49 of 63), Staff qualifications (41 of 63).n = 63
- Not one of the 580 awards with a known winner country has gone to a foreign company so far. National average: 1%.n = 580
- 2% of the bids received came from other countries (277 procedures with a bid mix) — all bidders, not just the winners. Country: 3%.n = 277
- 71% of the bids received came from small and medium-sized enterprises (277 procedures with a bid mix). Country: 75%.n = 277
- From notice to award takes a median 94 days here (186 procedures). Country: 91 days.n = 186
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.
Expected next awards
From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 26% of 11,200 closed expectation windows produced a notice.
- Sept 2026Repair & maintenance
about every 5 months · 21 awards · last Apr 2026 to Aquatrade GmbH - Nov 2026Construction work
about every 1 months · 228 awards · last Oct 2026 to EUROVIA Bau GmbH Standort Bottrop - Nov 2026Architecture & engineering
about every 2 months · 262 awards · last Oct 2026 to Ingenaix GmbH - Nov 2026Cleaning, environment & waste
about every 4 months · 18 awards · last Jul 2026 to KES GmbH - Jan 2027Construction materials
about every 4 months · 17 awards · last Sept 2026 to SEH Engineering GmbH
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SEH Engineering GmbH · Hannover | 22 | 2023–2026 |
| LPI Ingenieurgesellschaft mbH · Hannover | 16 | 2025–2026 |
| IGS Ingenieure GmbH & Co. KG · Weimar | 15 | 2024–2026 |
| Mull und Partner Ingenieurgesellschaft mbH · Köln | 12 | 2025 |
| EUROVIA Bau GmbH Standort Bottrop · Bottrop | 11 | 2024–2026 |
| STRABAG AG Direktion NRW Bereich Düren · Nörvenich | 11 | 2024–2026 |
| Amand Bau NRW GmbH & Co. KG | 10 | 2025–2026 |
| GTU Mobility GmbH & Co.KG · Hannover | 10 | 2025–2026 |
| Ingenieurbüro SLS · Grevenbroich | 9 | 2024–2026 |
| Gerhard Tummes GmbH & Co. KG · Moers | 8 | 2025–2026 |
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.