DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH
Germany · 32 open tenders · 1,844 documented awards
Current tenders
7141, AG Surveying Advance Case
Deadline 7 Oct ·
7141, AG Survey Anticipatory Case
Deadline 7 Oct ·
VKE D113, A1, 6-lane expansion Münster - Osnabrück - BL3,4a_Inspection Engineer
Deadline 8 Oct ·
VKE D113, A1, 6-strip extension Münster - Osnabrück - BL3,4a_Test Engineer
Deadline 8 Oct ·
A20, VKE A043, Services of static and structural testing of engineering structures for traffic facilities according to RVP
Deadline 9 Oct ·
A10, VKE 132.1, Extension of Tank and Rest Stop Facilities Seeberg East and West - BGU, Chemical Analysis, Documentation - Remediation Area
Deadline 9 Oct ·
A10, VKE 132.1, Expansion of the tank. and rest areas Seeberg East and West - BGU, chem. Analyse, Documentation - Restoration area
Deadline 9 Oct ·
A20, VKE A043, Services of static and structural testing of engineering structures for traffic facilities according to RVP
Deadline 9 Oct ·
A7, VKE A031, Safety and health protection coordination during the preparation of the procurement, construction preparation and construction execution of construction phase 2 (demolition of existing structure)
Deadline 16 Oct ·
A7, VKE A031, Safety and Health Protection Coordination during the Preparation of the Award, Construction Preparation and Construction Execution of Construction Phase 2 (Demolition of Existing Structure)
Deadline 16 Oct ·
A30, Bohrl. Baugrund Vs Section 4/5/6 (Fipa)
Deadline 22 Oct ·
A30, Drilling Ground Vs Section 4/5/6 (Fipa)
Deadline 22 Oct ·
VKE C371; Reconstruction Wiesbaden Junction - Supplementary Survey Support Planning
Deadline 23 Oct ·
VKE C371; Conversion Wiesbadener Kreuz - Complementary planning-accompanying surveying
Deadline 23 Oct ·
A3/A4/A59 Framework Agreement Traffic Safety
Deadline 27 Oct ·
A3/A4/A59 Framework Agreement Traffic Safety
Deadline 27 Oct ·
Personnel Management System (HRMS) - Selection, Implementation and Operation of an Integrated Personnel Management System
Deadline 27 Oct ·
Personnel Management System (HRMS) - Selection, Implementation and Operation of an Integrated Personnel Management System
Deadline 27 Oct ·
A14, Lot 2.3.1 preliminary design BW 102Ü L9 section km 4+100
Deadline 3 Nov ·
A14, Lot 2.3.1 preliminary design BW 102Ü L9 route km 4+100
Deadline 3 Nov ·
A81 AK Stuttgart - AS Sindelfingen-Ost, A 8/A 81 Conversion AK Stuttgart; Statements on climate protection according to §13 KSG, expert opinion on air pollutants and nitrogen deposition
Deadline 3 Nov ·
Project A / A61 AD Hockenheim; Planning-accompanying surveying
Deadline 3 Nov ·
A6 / A61 AD Hockenheim;
Deadline 3 Nov ·
A044 Grundlagen Vermessung
Deadline 3 Nov ·
A81 AK Stuttgart - AS Sindelfingen-Ost, A 8/A 81 Reconstruction AK Stuttgart; Measures for Climate Protection according to §13 KSG, Expert Report on Air Pollutants and Nitrogen Deposition
Deadline 3 Nov ·
Project A / A61 AD Hockenheim; Survey Accompanying Planning
Deadline 3 Nov ·
A044 Grundlagen Vermessung
Deadline 3 Nov ·
A6 / A61 AD Hockenheim;
Deadline 3 Nov ·
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
2018198
2019206
2020252
2021247
2022355
2023428
20241,320
20251,532
2026971
Clement What the numbers say about this buyer
- 61% of this buyer's awards went to companies that had already won here before (1,609 awards since 2010, spread over 628 companies). That is well above the national norm (45%) — newcomers have a harder time here than elsewhere.n = 1,609 awards since 2010
- The median procedure drew 2 bids (1,593 procedures with a bid count); 36% ended with a single bidder. Country: median 3.1 bids.n = 1,593
- Across 50 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (50 of 50), Professional register enrolment (50 of 50), Professional liability insurance (47 of 50), References: services (36 of 50).n = 50
- Not one of the 1,609 awards with a known winner country has gone to a foreign company so far. National average: 1%.n = 1,609
- 3% of the bids received came from other countries (461 procedures with a bid mix) — all bidders, not just the winners. Country: 3%.n = 461
- 74% of the bids received came from small and medium-sized enterprises (461 procedures with a bid mix). Country: 75%.n = 461
- From notice to award takes a median 108 days here (370 procedures). Country: 91 days.n = 370
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Expected next awards
From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 26% of 11,200 closed expectation windows produced a notice.
- Oct 2026Business services
about every 8 months · 7 awards · last Mar 2026 to Johanssen + Kretschmer Strategische Kommunikation GmbH - Nov 2026Architecture & engineering
about every 2 months · 936 awards · last Sept 2026 to IGB Ingenieurgesellschaft mbH - Nov 2026Construction work
about every 2 months · 515 awards · last Sept 2026 to HABAU Hoch- und Tiefbaugesellschaft m.b.H - Mar 2027IT services
about every 5 months · 23 awards · last Sept 2026 to LINKITSYSTEMS GmbH
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Schüßler-Plan Ingenieurgesellschaft mbH | 47 | 2016–2026 |
| IGS Ingenieure GmbH & Co. KG · Weimar | 41 | 2016–2026 |
| SSF Ingenieure AG | 32 | 2015–2026 |
| Ingenieurbüro für Verkehrsanlagen GmbH · Halle (Saale) | 25 | 2018–2026 |
| IGB Ingenieurgesellschaft mbH · Hamburg | 24 | 2012–2026 |
| Leonhardt, Andrä und Partner Beratende Ingenieure VBI AG | 20 | 2018–2026 |
| KREBS+KIEFER Ingenieure GmbH | 20 | 2017–2026 |
| EHS beratende Ingenieure für Bauwesen GmbH | 18 | 2017–2026 |
| INROS LACKNER SE | 17 | 2011–2026 |
| VIC Planen und Beraten GmbH · Potsdam | 16 | 2019–2026 |
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.