Friedrich & ClementBETA

Bundesanstalt für Straßen- und Verkehrswesen

Germany · 27 open tenders · 160 documented awards

Current tenders

FE 15.0744/2026/LRB - Review of the Assessment Methodology for Regular Structural Inspections of Bridges according to DIN 1076
BELOW THRESHOLDDeadline 6 Oct ·
Z2l-FE RV.0006/2025 - "Sight relationships between cyclists traveling straight ahead and motor vehicle drivers turning right at urban intersections, Data package 1"
BELOW THRESHOLDDeadline 6 Oct ·
FE 02.0509/2026/LGB – ‘Practical management of woody and tree plantations to adapt to climate change’
BELOW THRESHOLDDeadline 7 Oct ·
FE 02.0509/2026/LGB - "Practical Handling of Woody Plant and Tree Planting..."
BELOW THRESHOLDDeadline 7 Oct ·
FE 15.0746/2026/CRB - Analysis of the protective duration of coating systems according to the modularized sheet 100
Deadline 15 Oct ·
FE15.0746/2026/CRB-Analysis of the protection duration of coating systems according to the modularized sheet 100
336.134 €Deadline 15 Oct ·
FE15.0746/2026/CRB - Analysis of the protective duration of coating systems according to the modularized sheet 100
Deadline 15 Oct ·
Construction and design of lateral site access roads in longitudinal traffic on motorways
Deadline 20 Oct ·
"Design and construction of lateral construction site accesses in longitudinal traffic on motorways"
235.294 €Deadline 20 Oct ·
Training and Design of Lateral Construction Site Access Routes in Longitudinal Traffic on Federal Motorways
Deadline 20 Oct ·
Annual maintenance and calibration of scales of various designs -
BELOW THRESHOLDDeadline 26 Oct ·
Annual maintenance and calibration of scales of various designs -
BELOW THRESHOLDDeadline 26 Oct ·
FE 07.0325/2024/ERB - Investigation of crack formation in asphalt wearing courses after short storage periods
Deadline 27 Oct ·
FE 07.0325/2024/ERB - Investigation of crack formation in asphalt surface layers after short storage duration
252.101 €Deadline 27 Oct ·
FE 05.0218/2026/EGB - "Development of Procedures and Guidelines for Mechanical Soil Improvements"
BELOW THRESHOLDDeadline 27 Oct ·
FE 07.0325/2024/ERB - Investigation of crack formation in asphalt surface layers after short storage period
Deadline 27 Oct ·
FE 03.0665/2026/FRB - Procedure for identifying wildlife accident hotspots
BELOW THRESHOLDDeadline 27 Oct ·
FE 05.0218/2026/EGB - "Development of Procedures and Guidelines ..."
BELOW THRESHOLDDeadline 27 Oct ·
FE 15.0748/2026/FRB - Estimation of the effects of overloading on bridges and distribution of axle load measurement points for calculating these estimations
BELOW THRESHOLDDeadline 29 Oct ·
FE 15.0748/2026/FRB - Assessment of the impacts of overloading on …
BELOW THRESHOLDDeadline 29 Oct ·
FE 04.0367/2026/MGB - Development and Optimization of Statistical Methods for Quality Assurance in Condition Recording and Assessment (ZEB) in Subproject (TP) 3 Material Characteristics (Surface)
BELOW THRESHOLDDeadline 3 Nov ·
FE 03.0673/2026/IGB - Practice-oriented quality assurance and integration of heterogeneous traffic data for use in regional traffic control centers
BELOW THRESHOLDDeadline 3 Nov ·
"Driving behavior, space requirements and safety of cycling on downhill sections"
Deadline 10 Nov ·
"Driving Behavior, Space Requirements and Safety of Cycling on Downhill Sections"
231.092 €Deadline 10 Nov ·
Cycling Behavior, Space Requirements and Safety of Bicycle Traffic on Downhill Sections
Deadline 10 Nov ·
FE 02.0511/2026/IRB - Konstruktiver Lärmschutz an sensiblen Stellen
BELOW THRESHOLDDeadline 2 Dec ·

Purchasing rhythm

Awards per year — who knows the rhythm prepares before the notice appears.

20242
2025259
2026219

Clement What the numbers say about this buyer

  • 60% of this buyer's awards went to companies that had already won here before (156 awards since 2023, spread over 62 companies). That is well above the national norm (45%) — newcomers have a harder time here than elsewhere.n = 156 awards since 2023
  • The median procedure drew just one bid (133 procedures with a bid count); 53% ended with a single bidder. Country: median 3.1 bids.n = 133
  • The award came in at a median 100% of the estimated value (20 awards with both estimate and value) — pricing at the estimate is usually about right here. Country: 86%.n = 20
  • Across 12 procedures with structured selection criteria, this buyer most often required: References: services (12 of 12), Equipment, plant and technical facilities (1 of 12), Professional liability insurance (1 of 12).n = 12
  • From notice to award takes a median 129 days here (39 procedures). Country: 91 days.n = 39
  • 1% of awards went to companies from abroad (156 awards with a known winner country). National average: 1%.n = 156

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 26% of 10,807 closed expectation windows produced a notice.

  • Nov 2026R&D services
    about every 1 months · 143 awards · last Sept 2026 to Zentrum für angewandte Forschung und Technologie e.V.

Who has won here before

CompanyAwardsPeriod
Bergische Universität Wuppertal102025–2026
HafenCity Universität Hamburg62025–2026
Ruhr-Universität Bochum · Bochum62025–2026
ifeu - Institut für Energie- und Umweltforschung Heidelberg gGmbH · Heidelberg42025
Photron Deutschland GmbH · Stuttgart42025
Universität Stuttgart · Stuttgart42025
Planungsbüro VIA eG · Köln42025
Ruhr - Universität Bochum · Bochum42025
Technische Universität Berlin · Berlin42026
Ruhr-Universität Bochum, Lehrstuhl für Verkehrswesen · Bochum42025

From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.