Friedrich & ClementBETA

Berliner Wasserbetriebe

Germany · 30 open tenders · 2,329 documented awards

Current tenders

Framework agreement for the supply and final assembly of various chairs
813.411 €Deadline 7 Oct ·
48088/67228 Framework agreement on maintenance, repair and …
BELOW THRESHOLDDeadline 7 Oct ·
Framework agreement for the supply and final assembly of various chairs
813.411 €Deadline 7 Oct ·
26/TrKo-0023 KSS2020_FL06_Hose Program III
BELOW THRESHOLDDeadline 7 Oct ·
Framework Agreement for the Supply and Final Assembly of Various Chairs
BELOW THRESHOLDDeadline 7 Oct ·
24/TrKo-0172 Bulgarian Street
BELOW THRESHOLDDeadline 7 Oct ·
Framework Agreement Repair Radio Equipment
BELOW THRESHOLDDeadline 9 Oct ·
22/TrKo-0158 Amorstraße / Eichbuschstraße
BELOW THRESHOLDDeadline 12 Oct ·
21/TrKo-0308 Kleine Waldstraße
BELOW THRESHOLDDeadline 12 Oct ·
205850/67337 Repair structure service water ceiling - KW Waßmannsdorf
BELOW THRESHOLDDeadline 13 Oct ·
Safety and Rescue Harnesses
Deadline 14 Oct ·
7.0t truck panel van, single cabin
Deadline 14 Oct ·
Purchase of commercial vehicles
Deadline 14 Oct ·
Purchase of Commercial Vehicles
Deadline 14 Oct ·
Framework agreement for the supply of personal protective equipment (eProcurement)
Deadline 14 Oct ·
187365/58530 New Construction APw Lichterfelde - Building Technology, External Facilities, …
BELOW THRESHOLDDeadline 15 Oct ·
18/01-00174 Schmidstraße
BELOW THRESHOLDDeadline 20 Oct ·
Confluence Licenses Subscription
Deadline 21 Oct ·
Confluence licenses subscription
Deadline 21 Oct ·
Confluence Licenses Subscription
BELOW THRESHOLDDeadline 21 Oct ·
Lot 1 (manufactured Pfister scales Bilanciai)
Deadline 26 Oct ·
15985/65818 Diverse Treatment Plants RV Weighing Data Acquisition System
Deadline 26 Oct ·
WW Wuhlheide, Opt. Freshwater Supply and Auxiliary UV Plant, VP 2 UV Plant
BELOW THRESHOLDDeadline 29 Oct ·
Rahmenvereinbarung für die Lieferung von Pulveraktivkohle in Lose für die OWA Tegel
Deadline 5 Nov ·
166037/67938 Klärwerk Ruhleben Renewal Control Cabinets of the Soot Blowers ...
BELOW THRESHOLDDeadline 11 Nov ·
Ing. GP Neubau Schachtpumpwerke mit Betriebsgebäuden
Deadline 16 Nov ·
Ing. GP Neubau Schachtpumpwerke mit Betriebsgebäuden
Deadline 16 Nov ·
Ductile Cast Iron Pipe
Deadline 30 May ·
Deutschland-Berlin: Verrohrungen
Deadline 31 May ·
Ductile Cast Iron Pipe
Deadline 31 May ·

Purchasing rhythm

Awards per year — who knows the rhythm prepares before the notice appears.

2018357
2019314
2020425
2021354
2022802
20231,078
20242,336
20252,452
20261,233

Clement What the numbers say about this buyer

  • 57% of this buyer's awards went to companies that had already won here before (2,034 awards since 2017, spread over 866 companies). That is well above the national norm (45%) — newcomers have a harder time here than elsewhere.n = 2,034 awards since 2017
  • 40% of the bids received came from small and medium-sized enterprises (624 procedures with a bid mix). Country: 75%.n = 624
  • The median procedure drew 2 bids (1,999 procedures with a bid count); 35% ended with a single bidder. Country: median 3.1 bids.n = 1,999
  • The award came in at a median 73% of the estimated value (105 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 86%.n = 105
  • From notice to award takes a median 159 days here (457 procedures). Country: 91 days.n = 457
  • Across 37 procedures with structured selection criteria, this buyer most often required: References: works (2 of 37), Minimum annual headcount (2 of 37), Professional liability insurance (2 of 37).n = 37
  • < 1% of the bids received came from other countries (624 procedures with a bid mix) — all bidders, not just the winners. Country: 3%.n = 624

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 26% of 11,200 closed expectation windows produced a notice.

Who has won here before

CompanyAwardsPeriod
vonRoll hydro (deutschland) gmbh & co kg1012020–2026
DAR GmbH Berlin312017–2026
spree systems GmbH · Berlin282020–2026
Saint-Gobain PAM Deutschland GmbH · Saarbrücken282020–2026
MAN Truck & Bus Deutschland GmbH182017–2026
Siemens AG (Industrie) · Berlin162019–2025
STRABAG AG152009–2026
IfE Grothe GmbH152017–2026
best practice consulting AG · Münster152024–2026
Profi Engineering Systems AG142020–2025

From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.