Upgrade ventilation duct floor -3
Ertüchtigung Lüftungsleitung Etage -3
Germany · Aachen · how to bid here →
Your path to submission
- Deadline: 16 October at 09:00 — 9 days left.
- You submit on evergabe.NRW — not here and not by e-mail. ↗ Free bidder account on the cosinex platform required (created instantly); offers go through the bidding tool, usually plain text form suffices — no qualified signature. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (105 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Zauner Anlagentechnik GmbH.n = 105
- The median procedure drew just one bid (491 procedures with a bid count); 54% ended with a single bidder. Sector: median 4 bids.n = 491
- 44% of this buyer's awards went to companies that had already won here before (525 awards since 2016, spread over 290 companies). 56% went to new names.n = 525 awards since 2016
- The award came in at a median 72% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 8
- 63% of the bids received came from small and medium-sized enterprises (52 procedures with a bid mix). Sector: 87%.n = 52
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction work, 672 contracts went to foreign companies over the last 3 years (of 242,267 recorded awards) — mostly from Austria, Poland, France.
Typical field: median 1 (from 159 awards).
What the buyer is looking for
Type of service At the University Hospital Aachen (UKA), fire dampers are successively renewed, primarily because they show age-related defects and damage. These fire dampers are located in air ducts of the standard air network essentially to supply the useful areas on floor -3. Therefore, before the flap conversion, it must be ensured whether a replacement measure has to be taken for the time of the conversion. The fire dampers are in the entire 3. Basement distributed. The work is carried out both in the technical centre. If possible, the replacement of the fire dampers should be carried out on an area-by-area basis. Accordingly, the collection routes must be calculated. The selected fire dampers, including possible airtight dampers and the air duct pieces necessary for the removal, must be removed and expanded against dampers of the same dimensions with motor drive and Siemens fire alarm panel for fire dampers. Scope of the service in terms of service description
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Elektro Gena · Alsdorf | 12 | 2023–2026 |
| F.J. Peterhoff GmbH | 11 | 2017–2024 |
| Siemens Healthcare GmbH · Erlangen | 9 | 2015–2022 |
| GEWA Gesellschaft für Gebäudereinigung und Wartung mbH | 8 | 2018–2026 |
| Carl Zeiss Microscopy GmbH · Jena | 8 | 2014–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid