BLB NRW BB / TGdB Wesel / Construction Program / Electrical Systems / 080-26-00650
BLB NRW BB / TGdB Wesel / Bauprogramm / Elektrische Anlagen / 080-26-00650
Germany · Düsseldorf · how to bid here →
Your path to submission
- Deadline: 14 October at 09:30 — 6 days left.
- You submit on evergabe.NRW — not here and not by e-mail. ↗ Free bidder account on the cosinex platform required (created instantly); offers go through the bidding tool, usually plain text form suffices — no qualified signature. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 15% of this buyer's awards went to companies that had already won here before (54 awards since 2026, spread over 36 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 54 awards since 2026
- The median procedure drew 5 bids (23 procedures with a bid count); 35% ended with a single bidder. Sector: median 4 bids.n = 23
- From notice to award takes a median 20 days here (36 procedures). Sector: 87 days.n = 36
- Across 20 procedures with structured selection criteria, this buyer most often required: Special authorisation or membership required (18 of 20), Share of subcontractors (18 of 20), Quality management (18 of 20), Security of supply required (17 of 20).n = 20
- Not one of the 54 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 54
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction work, 672 contracts went to foreign companies over the last 3 years (of 242,267 recorded awards) — mostly from Austria, Poland, France.
Typical field: median 5 (from 16 awards).
What the buyer is looking for
As part of the modernisation of a federal technical building, the electrical installations of a highly available data centre of availability class 4 will be modernised in accordance with DIN EN 50600. The work is carried out during operation under special requirements for maintaining availability. The scope of services includes the expansion and conversion of two main low-voltage distributions, including the connection of two existing transformer stations, as well as the adaptation of the sub-distribution level. This includes the replacement of nine sub-distributions up to 63 A, the replacement of the distribution for the general power supply (up to 160 A) including the combination of existing distributions, the establishment of a network transfer sub-distribution for the general power supply, the replacement of two sub-distributions for the UPS-supplied consumers, four sub-distributions…
Show full description
… for the system space, and the refurbishment of sub-distributions to supply the refrigeration systems. To increase availability, the final circuits of the computing systems are monitored by RCM measurement systems. Two independent photovoltaic systems with an output of approx. 36 kWp each will be installed on the metal-clad gable roof. This includes the installation of a sub-distribution for the PV components (without inverters) as well as the installation of two distributions to accommodate surge protection devices. In addition, the cable support systems in the system room are adapted, the lighting fixtures are replaced and extensive cable and cable laying is carried out inside and outside the building. Generators must be provided to ensure availability during the conversion measures. In addition, the fire detection, access control and burglary detection systems are adapted to the changed structural space situation. The scope of services also includes the necessary testing and measurement work, the preparation of the audit documents as well as the ready-to-use commissioning and user instruction. ? Type and scope of services Electrical systems Self-power supply systems - PV system with approx. 142 modules - 2 inverters - NA protection Fire brigade shutdown - Energy management system for consumption and load monitoring Main and sub-distributions - Conversion or expansion of the low-voltage main distributions (path A/B) - Measuring system for energy measurement according to DIN EN 50600 - RCM monitoring (approx. 220 final circuits) - 9 sub-distributions (up to 63A) - 2 sub-distributions for the UPS-eligible consumers (up to 630A) - 2 sub-distributions for overvoltage protection technology - 2 sub-distributions for refrigeration technology (up to 100A) - 2 sub-distributions for system technology (up to 250A) - 1 sub-distribution for general consumers (up to 160A) - 1 sub-distribution for the grid switching of the UV-Allg. Cable systems - connection of two transformer stations on the MS/NS side - approx. 120m MS cable - approx. 100m earth power cable - approx. 750m signal / data cable - approx. 1530 signal / data cables - approx. 5900m halogen-free low-voltage cables - approx. 100m cable in functional preservation - approx. Safety lighting - approx. 90 luminaires - 4 emergency hand luminaires - 8 emergency sign luminaires Disassembly and disposal of the systems to be replaced - Disassembly of the existing MS system incl. transformer - Disassembly of the LVs to be replaced Fire protection / Building introduction / Seals - Fire protection foreclosures - Building introduction / Seals ? Communication & Safety technology Fire alarm system - 13 optical smoke detectors with sockets - 3 acoustic/optical signal transmitters - Adaptation of the software Intrusion detection and access control system - 5 latch plate and magnetic contacts - 5 input modules - 4 RFID card readers - Adaptation
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Ingenieurbüro Becker und Henze GmbH | 4 | 2026 |
| Siemens AG | 2 | 2026 |
| Ingenieurbüro Stelter | 2 | 2026 |
| Leymann Keramikbau GmbH & Co KG · Sulingen | 2 | 2026 |
| Portawin GmbH | 2 | 2026 |
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.