Friedrich & ClementBETA

Duurzame nieuwbouw depot collecties Utrecht

Netherlands · how to bid here →

Your path to submission

  1. Deadline: 30 November at 10:00 — 54 days left.
  2. You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
  3. Offer and evidence in: NLD.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 5% of this buyer's awards went to companies that had already won here before (725 awards since 2015, spread over 311 companies). 95% went to new names.n = 725 awards since 2015
  • The median procedure drew 3 bids (617 procedures with a bid count); 19% ended with a single bidder. Country: median 3.9 bids.n = 617
  • The award came in at a median 86% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 85%.n = 21
  • 38% of the bids received came from small and medium-sized enterprises (296 procedures with a bid mix). Country: 44%.n = 296
  • 11% of awards went to companies from abroad (725 awards with a known winner country). National average: 11%.n = 725

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Netherlands, 2,055 contracts went to foreign companies over the last 3 years (of 35,290 recorded awards) — mostly from Germany, France, Belgium.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The municipality has set itself the goal of taking good care of the heritage and art collections and preserving them for later generations. To this end, the municipality wants to realize a building that meets the current requirements for the management of art and heritage and that is future-proof. From the first preparations of the project, the municipality has been working intensively with all users of the depot and other stakeholders. For the design and construction, the municipality has drawn up requirements in the field of sustainability, circularity, and the operation of the building. The plans also looked closely at the ecological green structure, the urban integration and the CO2 impact. The depot is a building with high climate requirements. The collections require good control of, among other things, temperature and humidity. This requires an integral design and a good execution, with specific attention to connections and building physics requirements.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.

Contract

BuyerGemeente Utrecht
TypeWorks
Estimated valuevalue not published
Published4 October 2026

Who has won here before

CompanyAwardsPeriod
Jos Scholman Groen B.V.82024–2026
BAM Infra B.V.52024–2026
Gebroeders M. en W. Bron B.V.32024–2026
A. Agterberg B.V.32024–2025
Schreuders Groen B.V.22024–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadline — Monday 30 November at 10:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TenderNed. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →