Aannemingsovereenkomst onderhoud WRK-III ruwwatertransportleidingsysteem
Netherlands · how to bid here →
Your path to submission
- Deadline: 18 November at 12:00 — 44 days left.
- You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 5% of this buyer's awards went to companies that had already won here before (20 awards since 2024, spread over 19 companies). 95% went to new names.n = 20 awards since 2024
- The median procedure drew 3 bids (17 procedures with a bid count); 6% ended with a single bidder. Country: median 3.9 bids.n = 17
- Not one of the 20 awards with a known winner country has gone to a foreign company so far. National average: 11%.n = 20
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands, 2,047 contracts went to foreign companies over the last 3 years (of 35,143 recorded awards) — mostly from Germany, France, Belgium.
What the buyer is looking for
The assignment consists of carrying out various activities for the project ‘Removing pressure limitation WRK-III PART 1 and 2’. Part of the assignment is, among other things, to carry out the following activities: -Strengthening of existing spigot-muff joints with internal cuffs; -Replacing concrete pipe parts with steel pipe parts; -The realization of two new manholes on existing pipe parts. The following building materials are made available to the contractor by PWN: tubes, fittings, valves, fire, service or stop valves, sheathing pipes other than steel sheathing pipes, stamping posts, pointing posts and cables, and all materials to be processed which are necessary for the proper connection, protection and marking of the said materials For all diesel tools, HVO100 biodiesel should be used as fuel. The details of the contract can be found in the attached RAW specifications.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Van Baarsen Buisleidingen B.V. | 2 | 2024–2025 |
| Conval | 1 | 2025 |
| AVK Nederland B.V. | 1 | 2025 |
| T. Gerritsen B.V. | 1 | 2025 |
| Vattenfall Nederland | 1 | 2024 |