Calculation SDE++, CfD and SCE Subsidy Amounts and Advice
Berekening SDE++, CfD en SCE Subsidiehoogtes en advisering
Netherlands · how to bid here →
Your path to submission
- Deadline: 6 November at 11:00 — 33 days left.
- You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 14% of this buyer's awards went to companies that had already won here before (169 awards since 2018, spread over 83 companies). 86% went to new names.n = 169 awards since 2018
- The median procedure drew 5 bids (153 procedures with a bid count); 29% ended with a single bidder. Country: median 3.9 bids.n = 153
- 18% of awards went to companies from abroad (169 awards with a known winner country). National average: 11%.n = 169
- The award came in at a median 83% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 85%.n = 5
- 39% of the bids received came from small and medium-sized enterprises (104 procedures with a bid mix). Country: 44%.n = 104
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands, 2,047 contracts went to foreign companies over the last 3 years (of 35,143 recorded awards) — mostly from Germany, France, Belgium.
What the buyer is looking for
The scope of the activities is mirrored by the scope of the SDE++ scheme, the Two-way Contract (CfD of Contract for Difference) and the SCE scheme or adjustments and their future successors. A broadening or narrowing of these regulations also leads to a broadening or narrowing of the contract. The CfD is expected to be introduced in 2027 and shows a high degree of similarity with the SDE++ for the advisory work. Where this text is written about SDE++, SDE++ and/or CfD should be read. The opinion on the year 2026 covers the following topics, namely: - onshore wind energy; - offshore wind energy; - solar PV; - sun-thermia; - hydropower; - biomass (fermentation, combustion, gasification, advanced transport fuels); - electrification (including heat pumps, e-boiler, high temperature storage, hydrogen production from electrolysis); - storage or use of CO2 (CCS, CCU); and - other heat supply (res
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Vanberkel Professionals B.V. | 4 | 2024–2026 |
| USG Professionals BV | 4 | 2024–2026 |
| Eiffel B.V. | 3 | 2024–2026 |
| KPMG Advisory N.V. | 3 | 2024–2026 |
| Brunel Nederland B.V. | 3 | 2024–2026 |