"Supply of server equipment for the needs of CAIS EPP"
„Доставка на сървърно оборудване за нуждите на ЦАИС ЕОП“
Bulgaria · гр. София · how to bid here →
Your path to submission
- Deadline: 4 November at 23:59 — 28 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (97 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to ИФЕЛОУС ООД.n = 97
- 79% of this buyer's awards went to companies that had already won here before (968 awards since 2020, spread over 134 companies). 21% went to new names.n = 968 awards since 2020
- The median procedure drew just one bid (845 procedures with a bid count); 52% ended with a single bidder. Sector: median 2 bids.n = 845
- The award came in at a median 96% of the estimated value (242 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 97%.n = 242
- 5% of awards went to companies from abroad (968 awards with a known winner country). Sector average: 0%.n = 968
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/10/2026.
Foreign bidders
In Bulgaria · Software & IT systems, 1 contracts went to foreign companies over the last 3 years (of 1,017 recorded awards).
Submission language: BUL.
Typical field: median 2 (from 91 awards).
What the buyer is looking for
The subject of the public procurement includes the supply of 7 server configurations. *** The performance requirements are detailed in the CLIENT’s Technical Specification – Annex No. 1. · The subject of the public procurement includes the delivery of 7 server configurations for the needs of CAIS EOP. *** The performance requirements are detailed in the CONTRACTING AUTHORITY’s Technical Specification – Annex 1. *** Timeframe: - The delivery of the equipment is carried out within 30 (thirty) working days from the date of receipt of a notification of secured financing sent by the Assignor and submission by the Contractor of the specified performance guarantee, under the terms of the draft contract. - The period of warranty service is according to the period proposed by the participant in his offer, starting from the date of the acceptance-delivery protocol for the delivery of the…
Show full description
… equipment or from the date of registration in the manufacturer's portal, whichever occurs first. *** In case it is not a manufacturer, the participant should be duly authorized by the manufacturer of the hardware products or its official representative for the right of distribution/delivery of the offered hardware products on the territory of the Republic of Bulgaria. *** The requirement for authorization at the stage of submission of tenders is justified by the subject of the contract and represents a guarantee for its timely and quality performance. In the event that a contractor is selected who is denied authorisation by the manufacturer, this may lead to delays in the performance of the public procurement, as well as its termination. According to the findings of the Varhoven administrativen sad (Supreme Administrative Court), the requirement for authorisation is not in itself restrictive inasmuch as it guarantees the quality and reliability of the activity carried out. In normal commercial practice, authorisation is based on a contract, which may be directly with the manufacturer or with another economic operator authorised to authorise on behalf of the manufacturer’. (Decision No 10859 of 27 October 2021 of the Supreme Administrative Court in administrative case No 6546/2021, VIIo). In the documentation, the authorisation condition is placed extensively, i.e. it is not limited only to the manufacturer, but also to each of its official representatives. A general authorization is required, not for a specific procedure, and an opportunity is provided for any interested participant – partner, whether Bulgarian or foreign, to submit a tender, providing the opportunity to prove the above circumstance, both by an authorization letter and with any other equivalent document that certifies compliance with the specified requirement.
What you must prove — eligibility criteria
Възложителят не е предвидил критерии за подбор към участниците по обществената поръчка. Критерият за подбор, посочен в поле „Критерии за подбор (BT-809-Lot)“ от раздел „Тръжни условия“ е посочен единствено за нуждите на попълване на обявлението, предвид липсат… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| СИЕНСИС АД | 107 | 2020–2026 |
| ИФЕЛОУС ООД | 52 | 2021–2026 |
| А1 България ЕАД | 51 | 2021–2026 |
| КОНТРАКС АД | 51 | 2020–2026 |
| ПАРАФЛОУ КОМУНИКЕЙШЪНС ЕООД | 47 | 2020–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.