Objektplanung LPH 6-9
Germany · München · how to bid here →
Your path to submission
- Deadline: 8 October at 11:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (901 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Hubert & Freihart Ingenieure.n = 901
- 62% of this buyer's awards went to companies that had already won here before (4,907 awards since 2012, spread over 1,843 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 4,907 awards since 2012
- The award came in at a median 50% of the estimated value (32 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 88%.n = 32
- The median procedure drew 5 bids (4,173 procedures with a bid count); 19% ended with a single bidder. Sector: median 3 bids.n = 4,173
- Across 128 procedures with structured selection criteria, this buyer most often required: References: works (78 of 128), References: services (39 of 128), Staff qualifications (33 of 128), Professional liability insurance (33 of 128).n = 128
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.
Foreign bidders
In Germany · Architecture & engineering, 401 contracts went to foreign companies over the last 3 years (of 110,078 recorded awards) — mostly from Austria, Switzerland, Poland.
Submission language: DEU.
Typical field: median 1 (from 1,132 awards).
What the buyer is looking for
Extension of Max Planck High School, Weinbergerstr. 29, 81241 Munich Awarding of property planning services in accordance with § 34 HOAI, LPH 6-9 for the Max Planck High School, which was built in the 1960s, is to be expanded during ongoing school operation and an additional sports hall is to be rebuilt. Parts of the existing school, as well as individual pavilion buildings that are no longer in operation, must be demolished (a demolition planner has been switched on). The Gymnasium was placed under monument protection with the parts of the building that will be preserved during the planning of the extension. BEG funding is requested for the construction project. On the northern lawn playground, an interim pavilion with specialist classes and cafeteria, as a replacement for the buildings to be demolished and to continue the school operation during the construction phase, has just been…
Show full description
… completed (temporary service, a subsequent use by another school after completion of the extension is planned). The extension consists of: - New construction of a learning house building, including specialist classes and canteen (meeting hall) Four-storey building with partial basement and connection to the existing wing, solid construction with flat roof, building class 5, BGF approx. 14,000 m2, BRI approx. 57,200 m3. - New construction of a semi-basement double sports hall (roof structure partly on solid wooden supports) with flat roof in mixed construction (solid construction with wooden roof chair), building class 3, GFA approx. 2,100 m2, BRI 13,400 m3 The project is located in LPH 5. The start of the project requires the training/handover of two planners. A demolition planner and construction logistics specialist have been or will be switched on. Particular attention: - Measures during school operation - Monument protection - QNG/BNB certification - Static and constructive connections to the holdings · Extension of the Max Planck High School, Weinbergerstr. 29, 81241 Munich Awarding of property planning services in accordance with § 34 HOAI, LPH 6-9 for the Max Planck High School, which was built in the 1960s, is to be expanded during ongoing school operation and an additional sports hall is to be rebuilt. Parts of the existing school, as well as individual pavilion buildings that are no longer in operation, must be demolished (a demolition planner has been switched on). The Gymnasium was placed under monument protection with the parts of the building that will be preserved during the planning of the extension. BEG funding is requested for the construction project. On the northern lawn playground, an interim pavilion with specialist classes and cafeteria, as a replacement for the buildings to be demolished and to continue the school operation during the construction phase, has just been completed (temporary service, a subsequent use by another school after completion of the extension is planned). The extension consists of: - New construction of a learning house building, including specialist classes and canteen (meeting hall) Four-storey building with partial basement and connection to the existing wing, solid construction with flat roof, building class 5, BGF approx. 14,000 m2, BRI approx. 57,200 m3. - New construction of a semi-basement double sports hall (roof structure partly on solid wooden supports) with flat roof in mixed construction (solid construction with wooden roof chair), building class 3, GFA approx. 2,100 m2, BRI 13,400 m3 The project is located in LPH 5. The start of the project requires the training/handover of two planners. A demolition planner and construction logistics specialist have been or will be switched on. Particular attention: - Measures during school operation - Monument protection - QNG/BNB certification - Static and constructive connections to the existing building
What you must prove — eligibility criteria
Der Bieter hat mit dem Angebot den Nachweis über seine berufliche Qualifikation als Dipl.-Ing. TH/FH bzw. Bachelor/Master an Universitäten oder Fachhochschulen mit der Fachrichtung Architektur oder Bauingenieurwesen oder gleichwertig zu erbringen. –- Ist der B… ▸▾
Eigenerklärung des Bieters, dass im Auftragsfall der Nachweis einer Berufshaftpflichtversicherung mit folgendem Inhalt vorgelegt wird: Berufshaftpflichtversicherung mit Deckungssummen von über mind. 2,0 Mio. EUR für Personenschäden und mind. 3 Mio EUR für sons… ▸▾
Der Bieter muss mindestens die Referenzen 1-2 benennen; die benannten Referenzen müssen jeweils alle geforderten Mindestbedingungen erfüllen; bei Nichterfüllung einer Mindestbedingung führt dies zum Ausschluss des Angebots. Ein Projekt kann, wenn es die Mindes… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Schernthaner GmbH · Neuried | 81 | 2008–2026 |
| Söll Gerüstbau GmbH | 43 | 2009–2025 |
| GZIMI Garten- und Landschaftsbau GmbH | 41 | 2018–2026 |
| TM Ausbau GmbH | 40 | 2014–2026 |
| Probat Bau AG · Feldkirchen | 38 | 2007–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.