Duurzame nieuwbouw depot collecties Utrecht
Netherlands · UTRECHT · how to bid here →
Your path to submission
- Deadline: 30 November at 10:00 — 54 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (43 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to BAM Infra B.V..n = 43
- 5% of this buyer's awards went to companies that had already won here before (725 awards since 2015, spread over 311 companies). That is well below the sector norm (17%) — this buyer switches suppliers more often than others.n = 725 awards since 2015
- The median procedure drew 3 bids (617 procedures with a bid count); 19% ended with a single bidder. Sector: median 4 bids.n = 617
- 11% of awards went to companies from abroad (725 awards with a known winner country). Sector average: 2%.n = 725
- The award came in at a median 86% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 21
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Construction work, 31 contracts went to foreign companies over the last 3 years (of 2,408 recorded awards) — mostly from Belgium, Germany, France.
Submission language: NLD.
Typical field: median 4 (from 39 awards).
What the buyer is looking for
The municipality has set itself the goal of taking good care of the heritage and art collections and preserving them for later generations. To this end, the municipality wants to realize a building that meets the current requirements for the management of art and heritage and that is future-proof. From the first preparations of the project, the municipality has been working intensively with all users of the depot and other stakeholders. For the design and construction, the municipality has drawn up requirements in the field of sustainability, circularity, and the operation of the building. The plans also looked closely at the ecological green structure, the urban integration and the CO2 impact. The depot is a building with high climate requirements. The collections require good control of, among other things, temperature and humidity. This requires an integral design and a good execution, with specific attention to connections and building physics requirements. See tender documents.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Jos Scholman Groen B.V. | 8 | 2024–2026 |
| BAM Infra B.V. | 5 | 2024–2026 |
| Gebroeders M. en W. Bron B.V. | 3 | 2024–2026 |
| A. Agterberg B.V. | 3 | 2024–2025 |
| Schreuders Groen B.V. | 2 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.