7th comprehensive school, Bockmühle - construction preparation/soil refurbishment
7. Gesamtschule, Bockmühle - Baureifmachung/Bodensanierung
Germany · Wuppertal · how to bid here →
Your path to submission
- Deadline: 13 October at 08:30 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (151 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to Anlagenbau Faßhauer GmbH.n = 151
- 45% of this buyer's awards went to companies that had already won here before (352 awards since 2017, spread over 192 companies). 55% went to new names.n = 352 awards since 2017
- From notice to award takes a median 216 days here (16 procedures). Sector: 87 days.n = 16
- The median procedure drew 4 bids (278 procedures with a bid count); 14% ended with a single bidder. Sector: median 4 bids.n = 278
- The award came in at a median 84% of the estimated value (26 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 26
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction work, 672 contracts went to foreign companies over the last 3 years (of 242,267 recorded awards) — mostly from Austria, Poland, France.
Submission language: DEU.
Typical field: median 4 (from 149 awards).
What the buyer is looking for
Demolition, excavation and disposal work as part of the construction readiness for the new construction of the 7th Entire school · - Construction site equipment - Exploitation of ordnance during construction - Demolition and clearance of ordnance - Vibration monitoring for demolition, dismantling and earthworks - Stelcon slabs cancel and dispose of - approx. 750 m2 - Demolition and disposal of concrete slabs - approx. 1,750 m2 - Demolition and disposal of concrete slabs - approx. 6,250 m2 - Demolition and disposal of asphalt - approx. 500 m2 - Excavation of fillings (slag, building rubble, soil, etc.) and disposal - approx. 12,500 m3 - Excavation of silt (BM-0*) and disposal - approx. 3,500 m3 - Demolition and disposal of old buildings (foundations and other installations made of concrete, reinforced concrete, brick masonry, etc.) - approx. approx. 60 m3 - Floor installation as filling…
Show full description
… floor made of BM0 material - approx. 12,500 m3 - Disposal of building rubble/concrete - reinforced concrete RC1 - approx. 3,000 to - Disposal of building rubble/concrete - reinforced concrete RC2 - approx. 2,000 to - Disposal of building rubble/concrete RC3 - approx. 1,000 to - Disposal of building rubble/concrete - reinforced concrete DK0 - approx. 500 to - Disposal of building rubble/brick masonry RC1 - approx. 1,000 to - Disposal of silt BM-F0* - approx. 6,500 to - Disposal of filling (building rubble, slag, ash) BM-F3 - approx. 5,000 to - Disposal of filling (building rubble, slag, ash) DK0 - approx. 5,000 to - Disposal of filling (building rubble, Slag, ashes) DK1 – approx. 7,000 to – Disposal Refill (visually asbestos-cement fragments) DK1 – approx. 100 to – Allowance Disposal Refill (debris, slag, ashes) DK2 – approx. 5,000 to – Allowance Disposal Refill (debris, slag, ashes) DK3 – approx. 500 to – Disposal Asphalt bituminous – approx. 130 to – Disposal Asphalt of tar stock – approx. 50 to
What you must prove — eligibility criteria
Mit dem Angebot muss eingereicht werden • die vollständig ausgefüllte Bietererklärung mit allen darin geforderten Eigenerklärungen (u.a zur Leistungsausführung im eigenen Betrieb und / oder durch Nachunternehmer, Erklärung nach § 19 Abs. 3 Mindestlohngesetz, E… ▸▾
Auf Anforderung sind innerhalb von 6 Kalendertagen (beginnend mit dem Tag nach der Absendung dieser Anforderung) folgende Unterlagen/ Nachweise vorzulegen: • Eigenerklärung über die Ausführung von Leistungen (Referenzen) in den letzten 5 abgeschlossenen Kalend… ▸▾
Von Bietern, deren Angebote in die engere Wahl kommen, sind auf Anforderung des Auftraggebers innerhalb von 6 Kalendertagen (beginnend mit dem Tag nach der Absendung dieser Anforderung) folgende Unterlagen (bei Bietergemeinschaften für jedes Mitglied getrennt)… ▸▾
Von Bietern, deren Angebote in die engere Wahl kommen, sind auf Anforderung des Auftraggebers innerhalb von 6 Kalendertagen beginnend mit dem Tag nach der Absendung dieser Anforderung folgende Eigenerklärungen und Nachweise (bei Bietergemeinschaften für jedes … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SDH Bau GmbH · Dortmund | 7 | 2025–2026 |
| Gotthilf Benz Turngerätefabrik GmbH & Co. KG · Winnenden | 6 | 2025 |
| Vennes Erd- u. Tiefbau, Abbruch · Ratingen | 6 | 2025 |
| Kempen Krause Ingenieure GmbH | 6 | 2025 |
| BINZ Ambulance- und Umwelttechnik GmbH | 5 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.