Hidegaszfalt beszerzés
Hungary · Budapest · how to bid here →
Your path to submission
- Deadline: 19 October at 10:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN, HUN, HUN, HUN, HUN, HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (55 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to ViaCon Hungary Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság.n = 55
- 34% of this buyer's awards went to companies that had already won here before (794 awards since 2018, spread over 194 companies). That is well below the sector norm (54%) — this buyer switches suppliers more often than others.n = 794 awards since 2018
- 63% of the bids received came from small and medium-sized enterprises (465 procedures with a bid mix). Sector: 42%.n = 465
- The median procedure drew 3 bids (744 procedures with a bid count); 22% ended with a single bidder. Sector: median 3 bids.n = 744
- 10% of awards went to companies from abroad (794 awards with a known winner country). Sector average: 3%.n = 794
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Hungary · Construction materials, 8 contracts went to foreign companies over the last 3 years (of 467 recorded awards).
Submission language: HUN.
Typical field: median 5 (from 55 awards).
What the buyer is looking for
The framework sales contracts for the supply of cold asphalt pothole crushing mixtures to the contracting authority Magyar Közút Nonprofit Zrt. for a total amount of HUF 1 500 000 000 as follows: - Part 1: Bulk mixtures in the territory of Western Hungary for traffic below 2000E/day: a net envelope of HUF 121 000 000; - Part 2: Bulk mixtures in the territory of Eastern Hungary for traffic below 2000E/day: a net envelope of 43 000 000; - Part 3: In the territory of Western Hungary, mixtures with a specific binder for any traffic: a net envelope of HUF 413 000 000; - Part 4: In the territory of Eastern Hungary, mixtures with a specific binder for any traffic: a net envelope of HUF 703 000 000; - Part 5: In the territory of Western Hungary, a special mixture for low temperatures: a net envelope of HUF 106 000 000; - Part 6: In the territory of Eastern Hungary, a special mixture for low…
Show full description
… temperatures: a net envelope of HUF 114 000 000. The contracting authority is entitled to the contract for a period of 12 months after the entry into force of the contract. Pursuant to Section 141(4)(a), by unilateral declaration, it may be extended for a further period of up to 12 months until the financial envelope has been exhausted, if it has not been exhausted. The contracting authority established its procurement needs by determining in advance the maximum volume of procurement expected during the duration of the contract, from which the actual quantitative use may deviate, taking into account the specific needs arising during the duration of the contract. In view of this, the contracting authority shall apply the provisions of the Public Procurement Act. Pursuant to Section 58(1), it may differ from the total contractual quantity (quantitative difference) and, on the basis of the contract to be concluded, it undertakes only to place ad hoc orders up to at least 70% of the above contractually indicated amount. The detailed technical parameters of the products to be procured are detailed in the Technical Description and the planned quantity of the products are detailed in the Item Price Table. The contracting authority draws the attention of economic operators to the fact that any reference to a specific make or type in the procurement documents was made only in order to clearly determine the nature of the object. Contracting authority in the case of 321 /2015. Pursuant to Section 46(3) of the Government Decree, it accepts a product that is fully equivalent to it. · The framework purchase contract for the supply of cold asphalt pothole crushing mixtures to the contracting authority Magyar Közút Nonprofit Zrt., as follows: - Part 1: Bulk mixtures in the territory of Western Hungary for traffic below 2000E/day: in a net envelope of HUF 121 000 000 (Planned quantity: Dmax= 8 mm: 2 572 tonnes; Dmax=11 mm: 1 038 tonnes). The contracting authority is entitled to the contract for a period of 12 months after the entry into force of the contract. Pursuant to Section 141(4)(a), by unilateral declaration, it may be extended for a further period of up to 12 months until the financial envelope has been exhausted, if it has not been exhausted. The contracting authority established its procurement needs by determining in advance the maximum volume of procurement expected during the duration of the contract, from which the actual quantitative use may deviate, taking into account the specific needs arising during the duration of the contract. In view of this, the contracting authority shall apply the provisions of the Public Procurement Act. Pursuant to Section 58(1), it may differ from the total contractual quantity (quantitative difference) and, on the basis of the contract to be concluded, it undertakes only to place ad hoc orders up to at least 70% of the above contractually indicated amount. The detailed technical parameters of the products to be procured are detailed in the Technical Description and the planned quantity of the products are detailed in the Item Price Table. The contracting authority draws the attention of economic operators to the fact that any reference to a specific make or type in the procurement documents was made only in order to clearly determine the nature of the object. Contracting authority in accordance with Decree No 321/2015. Section 46(3) of the Government Decree
What you must prove — eligibility criteria
Előzetes igazolás valamennyi rész vonatkozásában: Ajánlattevő ajánlatában a 321/2015. (X. 30.) Korm. rendelet (a továbbiakban: Kr.) II. Fejezetnek megfelelően, az EEKD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajá… ▸▾
Előzetes igazolás valamennyi rész vonatkozásában: Ajánlattevő ajánlatában a 321/2015. (X. 30.) Korm. rendelet (a továbbiakban: Kr.) II. Fejezetnek megfelelően, az EEKD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajá… ▸▾
Előzetes igazolás valamennyi rész vonatkozásában: Ajánlattevő ajánlatában a 321/2015. (X. 30.) Korm. rendelet (a továbbiakban: Kr.) II. Fejezetnek megfelelően, az EEKD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajá… ▸▾
Előzetes igazolás valamennyi rész vonatkozásában: Ajánlattevő ajánlatában a 321/2015. (X. 30.) Korm. rendelet (a továbbiakban: Kr.) II. Fejezetnek megfelelően, az EEKD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajá… ▸▾
Előzetes igazolás valamennyi rész vonatkozásában: Ajánlattevő ajánlatában a 321/2015. (X. 30.) Korm. rendelet (a továbbiakban: Kr.) II. Fejezetnek megfelelően, az EEKD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajá… ▸▾
Előzetes igazolás valamennyi rész vonatkozásában: Ajánlattevő ajánlatában a 321/2015. (X. 30.) Korm. rendelet (a továbbiakban: Kr.) II. Fejezetnek megfelelően, az EEKD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajá… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Colas Út Építőipari Zártkörűen Működő Részvénytársaság | 12 | 2023–2026 |
| "Soltút" Útépítő, Fenntartó és Kereskedelmi Korlátolt Felelősségű Társaság | 11 | 2023–2026 |
| UTIBER Közúti Beruházó Kft | 10 | 2023–2026 |
| SPECIÁLTERV Építőmérnöki Korlátolt Felelősségű Társaság | 10 | 2023–2026 |
| STRABAG Általános Építő Korlátolt Felelősségű Társaság | 10 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.