DKG gyártm.szerelvény és szerelv.alk.részek száll.
Hungary · Paks · how to bid here →
Your path to submission
- Deadline: 16 October at 12:00 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (31 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to Fabo Kereskedelmi és Szolgáltató Kft..n = 31
- 27% of this buyer's awards went to companies that had already won here before (380 awards since 2017, spread over 76 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 380 awards since 2017
- 52% of the bids received came from small and medium-sized enterprises (176 procedures with a bid mix). Sector: 90%.n = 176
- The median procedure drew just one bid (348 procedures with a bid count); 68% ended with a single bidder. Sector: median 2 bids.n = 348
- 17% of awards went to companies from abroad (380 awards with a known winner country). Sector average: 7%.n = 380
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Hungary · Industrial machinery, 34 contracts went to foreign companies over the last 3 years (of 502 recorded awards) — mostly from Croatia, Germany, Italy.
Submission language: HUN.
Typical field: median 1 (from 31 awards).
What the buyer is looking for
· The purpose of the procurement is to supply DKG or equivalent* assembly and assembly parts (armatures, armature parts) within the duration of the Framework Agreement. The purpose of the procurement is to ensure, on the one hand, a continuous supply of spare parts and, on the other hand, the replacement of malfunctioning or malfunctioning safety valves. The contracting authority plans to conclude a framework agreement for the years 2027-2029 with an allocation of HUF 726 400 000, with the following quantities: The framework agreement contains 35 types of DKG or equivalent armatures and armature parts, of which the contracting authority plans to order the delivery of a total of 256 pieces over the 2-year period of the framework agreement. *The contracting authority shall determine equivalence as follows: An interchangeable part is equivalent in the present proceedings. A replacement part…
Show full description
… is any part which can be replaced by another part without any special repair or further working, which is identical in shape, nominal size, size and deviation of shape within the permissible tolerances and of the same material quality. It is for the tenderer to ensure and prove equivalence. Item No. Name Designated quantity 1 DKG-ÉT-4ASTAM TOLÓZÁR DN50 PN16 MOT. COMPLETE EQUIPMENT 7 2 DKG-YEAR BOX DN50 PN16 BOX 7 3 DKG-YEAR-4ASTA BOX DN50 PN16 BOX 5 4 DKG-YEAR-4ASTA BOX DN50 PN16 BOX DN50 PN16 BOX 1-2 5 5 5 5 DKG-YEAR-4ASTA BOX DN100 PN16 COMPLETE EQUIPMENT 12 6 DKG-YEAR BOX DN100 PN16 BOX 5 7 DKG-YEAR-4ASTA BOX DN100 PN16 BOX 10 8 8 DKG-YEAR-4ASTA BOX DN100 PN25 HAND COMPLETE EQUIPMENT 12 9 DKG-YEAR-4A SELF-STAYING BOX DN100 PN25-40 SELF-STAYING BOX DN100 3-018-29-00D SELF-STAYING BOX DN100 3-018-29-00D SELF-STAYING BOX 5 11 SELF-STAYING BOX DN100 PN16 COMPLETE BOX 12 12 SELF-STAYING BOX DN100 PN25 MOT. COMPLETE EQUIPMENT 12 13 DKG-YEAR-4ASTA SECOND EQUIPMENT DN150 PN16 COMPLETE EQUIPMENT 5 14 DKG-YEAR-4ASTA SECOND EQUIPMENT DN150 PN25 MANUFACTURED EQUIPMENT 10 15 DKG-YEAR-4ASTA SECOND EQUIPMENT DN150 PN25 SECOND EQUIPMENT DN150 PN25 SECOND EQUIPMENT DN150 PN25 SECOND EQUIPMENT DN150 PN25 SECOND EQUIPMENT DN150 PN25 SECOND EQUIPMENT DN150 PN25 SECOND EQUIPMENT DN150 PN25 SECOND EQUIPE DN150 PN25 SECOND EQUIPE PN16 COMPLETE EQUIPMENT 7 20 DKG-YEAR-4ASTAM TOLERANCE DN150 PN25 COMPLETE EQUIPMENT 10 21 DKG-YEAR-4 EQUIPMENT PAR DN200 PN25-64 GREECE EQUIPMENT 5 22 DKG-YEAR EQUIPMENT DN200 PN25-64 GREECE EQUIPMENT 3 23 DKG-YEAR-4ASTAM TOLERANCE DN200 PN25 COMPLETE EQUIPMENT 7 24 DKG-YEAR-4ASTAM KPL INTERNAL DN200 PN25 COMPLETE EQUIPMENT 10 25 DKG-YEAR-4ASTAM TOLERANCE DN250 PN25 COMPLETE EQUIPMENT 7 26 DKG-YEAR-4ASTAM BLUE DN250 PN25 SELF-INSTALLING BLUE 7 27 DKG-YEAR-4ASTAM KPL INTERNAL DN250 PN25 COMPLETE INTERNAL 7 28 DKG-YEAR-4ASTA KPL INTERNAL DN400 PN25 COMPLETE INTERNAL 5 29 DKG-YEAR-4 BLACK DN400 PN25 BLACK 1 30 DKG-GTNA-2SAL-O/R300 BLACK TAP DN100 PN16 COMPLETE LOVE 4 31 DKG GTNA-2SAL-O/R350 BLACK TAP DN150 MANUAL COMPLETE LOVE 6 32 DKG GTNA-2SAL-O/R350 BLACK TAP DN150 MOT. DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKG-GTNA-2SAL-O/R300 DKGTNA-2SAL-O/R300 DKGTNA-2SAL-O/R300 DKGTNA-2SAL-O/R300 DKGTNA-2SAL-GTNA-2SAL-O/R300 DKGTNA-2SAL-GTNA-2SAL-SAL-O-O/R300 DKG-GTN40 DKG-SAL-SAL-N40 DKG-G-G-SAL-SAL-SAL-N40 DKGG-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G-G- (IV. 29.) according to Section 34 of the HAEA Decree, according to the Classification of Nuclear Power Plant Systems and System Components in the Safety Class (ABOS) issued by MVM Paks Nuclear Power Plant Ltd. in accordance with the procedure for the nuclear safety certification of FEL 005 Suppliers: ABOS 2**. ** Safety Classification of Nuclear Power Plant Systems and Components: Government Decree 1/2022 on the nuclear safety requirements of nuclear installations and related regulatory activities (IV. 29.) Nuclear Safety annexed to the HAEA Decree
What you must prove — eligibility criteria
Alkalmassági követelmény M1 Alkalmatlan a (közös) ajánlattevő a Kbt. 65. § (1) bekezdés b) pontja és a 321/2015. (X.30.) Korm. rendelet 21. § (1) bekezdés a) pontja tekintetében, ha a részvételi felhívás feladásától visszafelé számított 6 évben (72 hónapban) n… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Közép-dunántúli Vízügyi Igazgatóság | 13 | 2023–2026 |
| Altox-Chem Kft. | 12 | 2023–2026 |
| MOL Magyar Olaj- és Gázipari Nyilvánosan Működő Részvénytársaság | 11 | 2023–2026 |
| Messer Hungarogáz Ipari Gázgyártó és Forgalmazó Korlátolt Felelősségű Társaság | 11 | 2023–2026 |
| Bunzl Magyarország Kft. | 7 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.