,,Изпълнение на инженеринг (проектиране, строителство и авторски надзор) за изграждане на обществени зони за отдих и зелени площи, включително физически елементи на градската среда за междублокови пространства в гр. Хасково по седем обособени позиции“
Bulgaria · гр. Хасково · how to bid here →
Your path to submission
- Deadline: 9 November at 23:59 — 38 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: BUL, BUL, BUL, BUL, BUL, BUL, BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (179 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to САГРАДА ООД.n = 179
- 66% of this buyer's awards went to companies that had already won here before (639 awards since 2016, spread over 187 companies). 34% went to new names.n = 639 awards since 2016
- The award came in at a median 85% of the estimated value (115 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 115
- The median procedure drew 2 bids (517 procedures with a bid count); 30% ended with a single bidder. Sector: median 2 bids.n = 517
- 0% of the bids received came from small and medium-sized enterprises (194 procedures with a bid mix). Sector: 17%.n = 194
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,077 recorded awards).
Submission language: BUL.
Typical field: median 2 (from 149 awards).
What the buyer is looking for
The following activities are included in the scope of this procurement for each of the lots: Activity 1 – preparation of an investment project in the technical design phase; Activity 2 – implementation of construction works /construction and installation works/ under the approved investment project, Activity 3 – exercising author’s supervision during construction. Activity 1 – preparation of an investment project in the technical design phase The design is single-phase and includes preparation of an investment project in the technical design phase for the respective site. The investment project shall be prepared in scope and content in accordance with the requirements of the Spatial Development Act and Regulation No 4 of 2001 on the scope and content of investment projects. The design shall also comply with: Regulation No RD-02-20-2 of 26 January 2021 laying down the requirements for…
Show full description
… accessibility and universal design of the elements of the accessible environment in the urban area and of buildings and facilities; as well as all applicable technical standards, norms and regulations of the current Bulgarian legislation. The investment project should clarify the specific design solutions to an extent that ensures the full implementation of all types of construction works on the site, as well as give design solutions that ensure compliance with the requirements for construction works under Art. 169 of the Spatial Development Act. The investment project must be drawn up in accordance with the technical specification of the lot concerned. The investment project must be submitted in 5 (five) original paper copies and 1 (one) electronic CD in the format of: graphic part - "dwg" and "pdf", text part - "word" and "pdf". The content of electronic media must be identical to paper media. The investment project is submitted to the Assignor with a handover protocol, which reflects the availability of the submitted project and its compliance with the requirements of the Assignor. Activity 2 – execution of construction and installation works under the approved investment projectThe execution of construction and installation activities begins after the issuance of the relevant construction permit and is carried out under the approved investment project for the same construction. The building permit is issued by the municipal administration on the basis of an investment project prepared and agreed with the control authorities and operating companies and a comprehensive assessment report on the compliance of the investment project with the essential requirements for construction under Article 142(6) of the Spatial Development Act. The participants in the construction and the relations between them in the implementation of the project are determined by the requirements of Section Two, Part Three of the SPA and the implementation instructions. The builder performs construction works for the site in accordance with the issued construction papers, the terms of the contract and the requirements of Art. 163 and Art. 163a of the Spatial Development Act. The circumstances related to the start, implementation and acceptance of the construction works for the implementation of the activities provided for in the investment project will be certified by the drawing up and signing by the participants of the relevant acts and protocols in accordance with Regulation No 3 of 2003 on the drawing up of acts and protocols during construction. Activity 3 – exercising author’s supervision during constructionIn connection with the exact observance of the investment project in the implementation of the construction works, the contractor through individual authorized persons, authors of the applicable project documentation by parts, should carry out author’s supervision in accordance with the requirements of Art. 162 of the Spatial Development Act and the implementation contract. With the supervision of the designers - authors of the individual parts of the investment project, the exact implementation of the project, compliance with architectural, technological and construction rules and norms, as well as the preparation of the project documentation for the commissioning of the site are guaranteed. Important: In the performance of all the activities covered by this contract, the Contractor is obliged to comply with the provisions in force relating to the performance and reporting under
What you must prove — eligibility criteria
Изискване за вписване в централния професионален регистър на строителя (ЦПРС) към Камарата на строителите в България за строежи от четвърта група, четвърта или по-висока категория или еквивалентен документ за вписване в съответен регистър на държава – членка н… ▸▾
Участниците следва за последните три приключили финансови години (в зависимост от датата, на която са създадени или започнали дейността си) да са реализирали минимален оборот, попадащ в обхвата на поръчката, изчислен на база годишните обороти. Минимално изискв… ▸▾
Участниците следва да са изпълнили дейности с предмет и обем, идентичен или сходен* с тези на поръчката за последните 5 (пет) години от датата на подаване на офертата. * Забележка: Под „дейност с предмет и обем, идентичен или сходен с предмета на поръчката“ сл… ▸▾
Участникът трябва да разполага с персонал и/или с ръководен състав с определена професионална компетентност за изпълнението на поръчката. Минимално изискване: Участникът следва да разполага най-малко със следните лица: 1.За изготвяне на инвестиционните проекти… ▸▾
Участниците следва да разполагат с валидна застраховка „Професионална отговорност“, произтичаща съгласно чл. 171 от ЗУТ във връзка с чл. 5, ал. 1 и ал. 2 от НАРЕДБА за условията и реда за задължително застраховане в проектирането и строителството (или еквивале… ▸▾
Изискване за вписване в централния професионален регистър на строителя (ЦПРС) към Камарата на строителите в България за строежи от четвърта група, трета или по-висока категория или еквивалентен документ за вписване в съответен регистър на държава – членка на Е… ▸▾
Участниците следва за последните три приключили финансови години (в зависимост от датата, на която са създадени или започнали дейността си) да са реализирали минимален оборот, попадащ в обхвата на поръчката, изчислен на база годишните обороти. Минимално изискв… ▸▾
Участниците следва да са изпълнили дейности с предмет и обем, идентичен или сходен* с тези на поръчката за последните 5 (пет) години от датата на подаване на офертата. * Забележка: Под „дейност с предмет и обем, идентичен или сходен с предмета на поръчката“ сл… ▸▾
Участникът трябва да разполага с персонал и/или с ръководен състав с определена професионална компетентност за изпълнението на поръчката. Минимално изискване: Участникът следва да разполага най-малко със следните лица: 1.За изготвяне на инвестиционните проекти… ▸▾
Участниците следва да разполагат с валидна застраховка „Професионална отговорност“, произтичаща съгласно чл. 171 от ЗУТ във връзка с чл. 5, ал. 1 и ал. 2 от НАРЕДБА за условията и реда за задължително застраховане в проектирането и строителството (или еквивале… ▸▾
Изискване за вписване в централния професионален регистър на строителя (ЦПРС) към Камарата на строителите в България за строежи от четвърта група, четвърта или по-висока категория или еквивалентен документ за вписване в съответен регистър на държава – членка н… ▸▾
Участниците следва за последните три приключили финансови години (в зависимост от датата, на която са създадени или започнали дейността си) да са реализирали минимален оборот, попадащ в обхвата на поръчката, изчислен на база годишните обороти. Минимално изискв… ▸▾
Участниците следва да са изпълнили дейности с предмет и обем, идентичен или сходен* с тези на поръчката за последните 5 (пет) години от датата на подаване на офертата. * Забележка: Под „дейност с предмет и обем, идентичен или сходен с предмета на поръчката“ сл… ▸▾
Участникът трябва да разполага с персонал и/или с ръководен състав с определена професионална компетентност за изпълнението на поръчката. Минимално изискване: Участникът следва да разполага най-малко със следните лица: 1.За изготвяне на инвестиционните проекти… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ЕВРОПЪТ 2005 ООД | 36 | 2023–2026 |
| АТА-СТРОЙ ЕООД | 34 | 2021–2026 |
| ГАРАНТ - 2000 ООД | 31 | 2021–2026 |
| ЕН АР КОНСУЛТ ЕООД | 21 | 2016–2026 |
| РАДЕВ -06 ЕООД | 21 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.