Suunnittelutöiden puitejärjestely 2027-2029 + 1 optiovuosi
Finland · Mikkeli · how to bid here →
Your path to submission
- Deadline: 6 November at 10:00 — 33 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FIN, FIN, FIN, FIN, FIN.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 4 bids (75 procedures with a bid count); 13% ended with a single bidder. Sector: median 8 bids.n = 75
- 26% of this buyer's awards went to companies that had already won here before (97 awards since 2018, spread over 59 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 97 awards since 2018
- The award came in at a median 108% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 79%.n = 6
- 5% of awards went to companies from abroad (97 awards with a known winner country). Sector average: 1%.n = 97
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Finland · Architecture & engineering, 33 contracts went to foreign companies over the last 3 years (of 5,131 recorded awards) — mostly from Sweden, Poland, Italy.
Submission language: FIN.
Typical field: median 8 (from 3,842 awards).
What the buyer is looking for
The building construction services of the City of Mikkeli will request your tender for a framework agreement for planning work in accordance with the invitation to tender. The framework agreement can also be used by other units and group companies of the City of Mikkeli. The subject matter of the design or the content of the assignment is not determined at this stage. The tasks focus on investment and repair projects in properties managed and managed by the City of Mikkeli. As a rule, the properties of the City of Mikkeli are conventional or demanding in the demanding category. The design sites are located in the areas of Mikkeli, Anttola, Haukivuori, Ristiina and Suomenniemi. The size and content of assignments range from small individual tasks to larger work packages. The invitation to tender is divided into five (5) lots. The tenderer may offer one or more lots. Elements of the…
Show full description
… invitation to tender: Component 1. Principal and Architectural Design Component 2. Structural Planning, Consulting and Supervision Component 3. HVAC Planning, Consulting and Supervision Component 4. Electrical Engineering, Consulting and Supervision Component 5. Building automation planning, consulting and supervision The Service Provider undertakes to observe professional secrecy in its operations with regard to the plans and tender documents drawn up. Exposures in accordance with point 3.2 of KSE2013. As a rule, the main design tasks of the sites belong to the architectural designer. SKOL grouping of persons according to RT 103621. The payment basis for assignments is the SKOL time-debit prices presented in the offer. Prices must be quoted in €/h/VAT 0%. In addition to personnel work, time-charging prices must include KSE2013, the special allowances referred to in section 5.3, as well as any travel expenses and travel time required for the performance of the task. Several planning tasks require you to get to know the site on site. The tenderer is responsible for notifying the qualifications of the designers participating in the design tasks in accordance with section 83 of RakL 751/2023. Eligibility must be proven on request. When ordering the work, a schedule for each design work and the designers to be used are agreed together with the supplier. If the schedule is delayed due to a reason attributable to the supplier, the customer has the right to charge sanctions in accordance with KSE2013. In design tasks, the aim must be to take into account the energy efficiency, low-carbon nature and the potential for a more efficient circular economy of the materials and working methods used when enabling the design task in question. The client requires the designer to get to know the site on site at the beginning of the design task. Possible planning meetings will be held in Mikkeli or TEAMS. During the construction site, the designer is obliged to visit the site whenever requested. Upon request, the designer must be able to arrive on site no later than the next working day, office time. Where appeals are brought against a decision taken following an invitation to tender, their effects shall be limited to the aspects to which the appeals relate. For the other areas, contracts may be awarded to the selected operators. · The City of Mikkeli's Housebuilding Services requests your offer for the main and architectural design of the renovations and alterations of properties and investments managed and managed by the City of Mikkeli, including other documents needed for the design project, such as possible building permit documents, building method report, room space cards, floor plans, etc. The job also includes site visits and participation in planning meetings. The presence of the principal designer during site visits and meetings is mandatory. Upon request, the designated designer must be able to arrive on the spot no later than the following working day, office hours. The content and scope of the work will be determined on a case-by-case basis and agreed upon separately for each project. Architectural Design Task List A is used to define the content of the works
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Finnish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Viherpalvelut Hyvönen Oy | 6 | 2020 |
| Tilausliikenne Himanen Oy | 5 | 2018–2025 |
| Lindström Oy | 2 | 2021 |
| OP Yrityspankki Oyj | 2 | 2021 |
| If Vahinkovakuutus Oyj, Suomen sivuliike · ESBO | 2 | 2021 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.