Friedrich & ClementBETA

Osallistumispyyntö: Leijona-korttelin perusparannus, projektinjohtourakoitsijan hankinta

Finland · HELSINGIN KAUPUNKI · how to bid here →

Your path to submission

  1. Deadline: 2 November at 11:00 — 30 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: FIN.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (287 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Louhintahiekka Oy.n = 287
  • 36% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 75%.n = 10
  • 55% of this buyer's awards went to companies that had already won here before (1,452 awards since 2018, spread over 520 companies). 45% went to new names.n = 1,452 awards since 2018
  • The median procedure drew 5 bids (1,093 procedures with a bid count); 8% ended with a single bidder. Sector: median 4 bids.n = 1,093
  • The award came in at a median 93% of the estimated value (92 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 92

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,787 recorded awards).

Submission language: FIN.

Typical field: median 5 (from 185 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the procurement is the acquisition of a project management contractor for the renovation of the Lion's Quarter. The renovation of the Lion's Quarter will be carried out as a collaborative project management contract in the development phase, where the work in the development phase will be carried out with the agreement of the development phase of the project management contract before the actual project management contract is signed. The project consists of a technical and operational renovation of the entire property. The project will renew and modernise building systems and their engine room facilities and improve energy economy. The project will renew, repair and renovate structures and building elements, as well as roofs, facades and windows and doors, based on condition studies and surveys. Indoors, surfaces, building components and luminaires are renewed and…

Show full description

… refurbished, and space changes are made to develop the user's operations and the versatility of the premises. The building's fire safety, accessibility, acoustics and sound insulation will be improved and IT, audiovisual and presentational capabilities will be developed. All construction work must take into account the requirements of building protection. The more detailed content of the contract and the comparison criteria are described in the preliminary tender documents annexed to the contract notice. The supporting documents can be found on the Tender Services page of the publication under the link indicated in the "Attachments and links" section.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — via the ESPD

The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Finnish.

Contract

BuyerHelsingin kaupunki, kaupunkiympäristön toimiala
TypeWorks
Estimated valuevalue not published
Published2 October 2026
CategoryConstruction work · CPV 45000000

Who has won here before

CompanyAwardsPeriod
Ramboll Finland Oy322022–2026
Linea Konsultit Oy (1639698-6)//Ramboll Finland Oy (0101197-5)//Sitowise Oy · ESBO322020–2026
SITOWISE OY312022–2026
Peab Oy232020–2025
AFRY Finland Oy (0625905-6)//Ramboll Finland Oy222020–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20206
202159
2022105
2023157
2024174
2025221
2026158

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 2 November at 11:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →