Energinet Eltransmission A/S, Insurance Procurement related to CAR including DSU, TPL, EIL, and On- and Offshore Terrorism Insurance for Bornholm Energy Island
Denmark · Fredericia · how to bid here →
Your path to submission
- Deadline: 2 November at 15:00 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG, ENG, ENG, ENG, ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 0% of the bids received came from other countries (7 procedures with a bid mix) — all bidders, not just the winners. Sector: 24%.n = 7
- 36% of awards went to companies from abroad (321 awards with a known winner country). Sector average: 20%.n = 321
- 19% of this buyer's awards went to companies that had already won here before (321 awards since 2018, spread over 85 companies). 81% went to new names.n = 321 awards since 2018
- The median procedure drew 3 bids (142 procedures with a bid count); 15% ended with a single bidder. Sector: median 2 bids.n = 142
- The award came in at a median 80% of the estimated value (31 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 95%.n = 31
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Denmark · Financial & insurance services, 123 contracts went to foreign companies over the last 3 years (of 667 recorded awards) — mostly from France, Germany, Spain.
Submission language: ENG.
Typical field: median 2 (from 642 awards).
What the buyer is looking for
The procurement is conducted as a negotiated procedure with prior call for competition.The tender process thus consists of two parts/phases, including request for prequalification and submission of tender.The procurement covers the insurance placements described in Lots 1-5 below.Lot 1: CAR, TPL primary and offshore terrorism and sabotage – EUR 450 Million any one occurrence, DSU primary (option) – EUR 50 Million in the aggregateLot 2: DSU excess layer – EUR 295 Million xs EUR 50 Million First loss limit and in the aggregateLot 3: TPL excess layer – EUR 75 Million xs EUR 25 Million any one occurrenceLot 4: Onshore Terrorism and Sabotage – EUR 156 Million any one occurrenceLot 5: Environmental Impairment Liability (EIL) – EUR 25 Million any one occurrenceEnerginet Eltransmission A/S reserves the right to award the contract based on the initial tender.There is no remuneration to…
Show full description
… participants in the negotiations.Costs incurred by the tenderer in connection with the preparation and submission of a tender for one or more lots are the tenderers to bear and will not be reimbursed.There is anticipated to be one negotiation meeting successfully via Microsoft Teams. · CAR, DSU, TPL and offshore terrorism and sabotage are mandatory components. DSU is a mandatory-priced option: a tender omitting a compliant DSU price is non-compliant, but the Contracting Entities may elect not to purchase the DSU coverage. Lot details: Quota share placement for both the lead insurer and followers, where tenderers are requested to submit bids according to the enclosed mandatory wording. The award criterion will be lowest price, based on the technical evaluation price. · Lot details: Quota share placement for both the lead insurer and followers, where tenderers are requested to submit bids according to the enclosed mandatory wording. The award criterion will be lowest price. · Lot details: Quota share placement for both the lead insurer and followers, where tenderers are requested to submit bids according to the enclosed mandatory wording. The award criterion will be lowest price. · Lot details: Quota share placement for both the lead insurer and followers, where tenderers are requested to submit bids according to the enclosed mandatory wording. The award criterion will be lowest price. · Lot details: All tenderers bidding for the EIL insurance must submit bids for the whole layer in accordance with the enclosed mandatory minimum requirements. All tenderers may in addition to the mandatory minimum requirements submit supplementary wordings and conditions. The award criterion will be lowest price.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Hitachi Energy Denmark A/S | 10 | 2024–2026 |
| Grid Solutions DENMARK, BRANCH OF Grid Solutions SAS Frankrig | 9 | 2024–2026 |
| Siemens Energy A/S | 8 | 2024–2026 |
| Per Aarsleff A/S | 7 | 2024–2026 |
| Bravida Danmark A/S | 6 | 2024–2026 |