ROK experts emissieloos bouwen en (bouw)logistiek op de Veluwe
Netherlands · Arnhem · how to bid here →
Your path to submission
- Deadline: 10 November at 11:00 — 34 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (17 awards, most recently November 2025) — by that rhythm the next award was due around February 2026. The last award went to Arcadis Nederland B.V..n = 17
- 2% of this buyer's awards went to companies that had already won here before (328 awards since 2015, spread over 135 companies). 98% went to new names.n = 328 awards since 2015
- The median procedure drew 4 bids (294 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 294
- The award came in at a median 84% of the estimated value (19 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 19
- 4% of awards went to companies from abroad (328 awards with a known winner country). Sector average: 8%.n = 328
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,675 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 2 (from 13 awards).
What the buyer is looking for
The Province of Gelderland wishes to conclude a framework agreement with one contractor (or group of contractors) that can provide the right knowledge and expertise in the field of: zero-emission work for, inter alia, new construction, maintenance, sewage works, road infrastructure, green management, area developments and other government building and maintenance projects; recharging infrastructure, grid connections and energy solutions related to grid congestion; zero-emission construction and construction logistics, focusing on equipment and vehicles; development of public recharging sites and connecting public and private parties The duration of the Framework Agreement is 24 months, with the intended start date no later than 1 February 2027. This period can be extended twice by 12 months by the province of Gelderland, in accordance with the provisions of the framework agreement.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| KPN B.V. | 2 | 2025 |
| Goudappel B.V. | 2 | 2024–2026 |
| DTV Consultants B.V. | 2 | 2024–2025 |
| Arcadis Nederland B.V. | 2 | 2025 |
| Van Doorn | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.