Ontwerpteam Paleis
Netherlands · Tilburg · how to bid here →
Your path to submission
- Deadline: 9 November at 10:00 — 37 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (31 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Witteveen+Bos Raadgevende ingenieurs B.V..n = 31
- The median procedure drew 3 bids (282 procedures with a bid count); 16% ended with a single bidder. Sector: median 5 bids.n = 282
- 6% of this buyer's awards went to companies that had already won here before (322 awards since 2015, spread over 164 companies). 94% went to new names.n = 322 awards since 2015
- The award came in at a median 94% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 8
- 8% of awards went to companies from abroad (322 awards with a known winner country). Sector average: 8%.n = 322
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,665 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 5 (from 25 awards).
What the buyer is looking for
The Contracting Authority is looking for one Contractor to conclude an Agreement that supervises: The architectural design, interior design, installation engineering design and structural design of the Palace, including all relevant aspects in the field of acoustics, fire safety, durability, etc. The work is carried out on the basis of a Program of Requirements. With the integral design team, this Program of Requirements is developed into specifications within the set conditions. Further information on cross-compliance is provided in phase 2 (award phase). Candidates must register for the entire lot, not for part of the work of the lot. In the integral design team, work is carried out by: o Restoration Architect incl cost management o Construction engineer o Building physics consultant (fire safety and acoustics) o Installation consultant
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Thuiszorg INIS B.V. | 3 | 2023–2025 |
| Broeren B.V. | 3 | 2025–2026 |
| Actief Huiszorg B.V. | 3 | 2023–2025 |
| Acteon Thuiszorg B.V. | 3 | 2023–2025 |
| Kompan B.V. | 2 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.