Levering van Bovenleidingmasten en Boorbuizen
Netherlands · AMSTERDAM · how to bid here →
Your path to submission
- Deadline: 20 October at 23:59 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 9% of this buyer's awards went to companies that had already won here before (48 awards since 2017, spread over 26 companies). 91% went to new names.n = 48 awards since 2017
- The median procedure drew 4 bids (42 procedures with a bid count); 10% ended with a single bidder. Sector: median 3 bids.n = 42
- 17% of awards went to companies from abroad (48 awards with a known winner country). Sector average: 8%.n = 48
- 41% of the bids received came from small and medium-sized enterprises (30 procedures with a bid mix). Sector: 27%.n = 30
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Netherlands · Construction materials, 31 contracts went to foreign companies over the last 3 years (of 405 recorded awards) — mostly from Germany, Belgium, France.
Submission language: NLD.
Typical field: median 3 (from 339 awards).
What the buyer is looking for
This contract includes the continuous, predictable and timely delivery of catenary masts and associated drill pipes (tube foundations) for the tram and metro catenary network, which has a size of approximately 250 kilometres. Objective of the Assignment: The primary objective is for CFP to have access to the necessary materials throughout the duration of the Framework Agreement. This should be done under the following conditions: Market-based and transparent prices: Prices must be in line with the current market and fully transparent. Comply with Program of Requirements: All materials supplied must strictly comply with the specifications as laid down in the Program of Requirements. High delivery reliability: Consistent and reliable delivery is crucial to ensure operational continuity. Compliance with agreed delivery times: Deliveries must be made promptly within the check-out Price sheet · See PvE see Price sheet
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| voestalpine Track Solutions Netherlands B.V. | 2 | 2025 |
| TK Elevator Netherlands B.V. | 2 | 2026 |
| Vossloh ETS B.V. | 2 | 2025 |
| VolkerRail Nederland B.V. | 2 | 2024–2025 |
| ICT Netherlands B.V. | 1 | 2024 |