Generalplanung Neubau Müllverbrennungsanlage
Germany · Düsseldorf · how to bid here →
Your path to submission
- Deadline: 2 November at 23:59 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 26% of this buyer's awards went to companies that had already won here before (59 awards since 2024, spread over 44 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 59 awards since 2024
- The median procedure drew just one bid (50 procedures with a bid count); 50% ended with a single bidder. Sector: median 3 bids.n = 50
- From notice to award takes a median 569 days here (39 procedures). Sector: 133 days.n = 39
- 8% of awards went to companies from abroad (59 awards with a known winner country). Sector average: 0%.n = 59
- Across 3 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (3 of 3), References: services (2 of 3), Quality control by institutes (2 of 3), Independent quality certificate (e.g. ISO 9001) (1 of 3).n = 3
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Architecture & engineering, 401 contracts went to foreign companies over the last 3 years (of 109,680 recorded awards) — mostly from Austria, Switzerland, Poland.
Submission language: DEU.
Typical field: median 3 (from 103,772 awards).
What the buyer is looking for
Stadtwerke Düsseldorf AG (hereinafter also referred to as "AG" or "Client") is planning the construction of a new thermal waste treatment plant (hereinafter referred to as "Plant"). The project includes the construction and operation of a new incineration line for the incineration of municipal and commercial waste, including turbine and heat extraction (energy part), as well as an option to construct a carbon capture plant at the same site. The construction and operation is carried out by the AG or a project company in which the AG is involved. · The incineration line is to be located on the site adjacent to the existing plant with a capacity of approximately 200,000 tons per year. The new construction will be carried out in parallel with the operation of the existing plant, which will be decommissioned only after completion of the commissioning of the new plant. The technical…
Show full description
… feasibility has already been examined. For the new building, the entire project planning is hereby tendered out as part of a general planning contract. The scope of planning services is considered to be complete and includes all planning activities necessary to achieve the new building (e.g. review of studies, preliminary and design planning, tender planning, procurement support, approval planning, detailed planning and execution planning, interface coordination, quality assurance, documentation, site management, construction supervision, commissioning coordination, support of trial operation and performance drives, training, scheduling and control, acceptance with processing of residual points). It comprises the service phases 1 - 8 based on the HOAI. The new incinerator is expected to start commercial operations in 2032. The general planning contract to be concluded between the client and the contractor (hereinafter also referred to as "AN") will have a term until the conclusion of the commissioned service phases. According to previous estimates, this is expected to be 31 December 2032. An extension of the contract is possible due to delays in the project. In the case of the project, it is intended to carry out a step-by-step commissioning of the planning services. The first stage "Stage 1" includes the basic determination and preliminary planning. The second stage "Stage 2" contains the design planning. In the third stage "Stage 3", the approval planning follows. The fourth stage "Stage 4" involves the preparation of the award. "Level 5" is followed by participation in the award procedure, execution planning, construction supervision including implementation with interface coordination, quality assurance, documentation, construction supervision up to commissioning and acceptance including training, scheduling, cost monitoring and control of residual points. The Client reserves the right to commission stage 4 ahead of stage 3. The AG is not obliged to commission the next stage. In addition, the steps are only commissioned if the responsible bodies of the WG agree to them. In the event of refusal of approval/committee approval, the Contractor may not assert any claims, in particular no claims for damages, against the Client. The client is also entitled to transfer the general planning contract to the project company without the consent of the contractor.
What you must prove — eligibility criteria
"2) Organigramm der Unternehmensstruktur 3) Auflistung der Produktpalette des Bewerbers, aus der hervorgeht, dass die benötigten Warengruppen abgedeckt werden können 4) Bestätigung durch Eigenerklärung zur Verwendung der deutschen Sprache gem. Vorlage, hinterl… ▸▾
17) Der Bewerber hat mindestens zwei geeignete Referenzen über Planungsleistungen für Neubauprojekte im Bereich der thermischen Verwertung nachzuweisen. Anerkannt werden der Neubau oder Ersatzneubau von Müllverbrennungsanlagen, Müllheizkraftwerken, Ersatzbrenn… ▸▾
23) Nachzuweisen sind ferner ein Qualitätsmanagementsystem nach DIN EN ISO 9001 oder gleichwertig sowie ein Arbeitsschutzmanagementsystem nach DIN ISO 45001, SCC, BG-Gütesiegel oder gleichwertig. Bei mehreren beteiligten Unternehmen ist die Zusammenführung zu … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Max Straube Industrierohrleitungsbau GmbH · Chemnitz | 8 | 2025 |
| Kraftanlangen Energies & Services SE | 4 | 2025 |
| Bechtle IT-Systemhaus GmbH · Krefeld | 3 | 2012–2024 |
| Ricoh Deutschland GmbH · Hannover | 3 | 2012–2017 |
| ABB AG · Mannheim | 3 | 2012–2015 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.