Suppression of PN 105 at Kayl. Engineering studies
Suppression du PN 105 à Kayl. Etudes d’ingénieur
Luxembourg · Luxembourg · how to bid here →
Your path to submission
- Deadline: 30 October at 10:00 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (23 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to SGI.n = 23
- The median procedure drew 3 bids (149 procedures with a bid count); 10% ended with a single bidder. Sector: median 5 bids.n = 149
- 31% of awards went to companies from abroad (232 awards with a known winner country). Sector average: 48%.n = 232
- 7% of this buyer's awards went to companies that had already won here before (232 awards since 2017, spread over 34 companies). 93% went to new names.n = 232 awards since 2017
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 28/09/2026.
Foreign bidders
In Luxembourg, 865 contracts went to foreign companies over the last 3 years (of 2,818 recorded awards) — mostly from Belgium, Germany, France.
Submission language: FRA.
Typical field: median 2 (from 6 awards).
What the buyer is looking for
This contract concerns the APD (Detailed Preliminary Draft) and EXE (Implementation Draft) studies relating to the project for the removal of level crossing PN105 in Kayl at the intersection of rue de Schifflange with the railway line from Noertzange to Rumelange at PK 6,216. The project provides for: - Development of an underground for active mobility, - Development of inclined plans and stairs on both sides of the railway tracks for active mobility. The project is being carried out in consultation with the dual-track project on rue Michel carried out by the Administration des ponts et chaussées.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in French, German.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Swietelsky Rail Benelux | 5 | 2024–2026 |
| COLAS RAIL | 4 | 2024–2025 |
| Ineo Scle Ferroviaire | 3 | 2024 |
| Galère Lux | 2 | 2025–2026 |
| Baatz Constructions | 2 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.