SKV Žilina-Čadca-Žarec, direction Billa - water supply reconstruction.
SKV Žilina-Čadca-Žarec, smer Billa -rekonštrukcia vodovodu.
Slovakia · Žilina · how to bid here →
Your path to submission
- Deadline: 30 October at 13:00 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (13 awards since 2018, spread over 6 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 13 awards since 2018
- The median procedure drew 2 bids (12 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 12
- 17% of the bids received came from other countries (6 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 6
- The award came in at a median 85% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 6
- 91% of the bids received came from small and medium-sized enterprises (6 procedures with a bid mix). Sector: 79%.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.
Submission language: SLK.
Typical field: median 5 (from 1,112 awards).
What the buyer is looking for
The reconstruction of the public water supply will consist of replacing the LT DN 150 pipe with a PE RC – D 160 x 9.5 mm SDR17 pipe with a length of 200.00 m. The contract also includes the connection of 10 existing water connections to the new water supply pipe from mat. PE100, D 32, SDR 11, PN16 with a total length of 44.0 m for single-family houses, the connection of 1 connection with a length of 4.0 m to the operation and the connection of 1 connection for phy. Elvyp with a length of 8.0 m. Buildings covered by this contract: - Reconstruction of public water supply LT DN 150 – replacement of pipes for pipes made of mat. PE RC – D160x9.5 mm SDR17 in the length of 200.00 m - 12 pieces of connections to existing water connections for new pipes of public water supply in the length of 56.00 m digging permit(s) for special use of communications; temporary and permanent landfills of…
Show full description
… materials; construction, approval of road markings and implementation of road markings; identification of utilities; geodetic focus of the factual implementation of the pipeline and documents for the handover and acceptance of the construction (records on pressure tests of the water supply, certificates on built-in materials and equipment, laboratory analysis of water quality, test of the sketching conductor of the water supply, statements of the authorities and organizations concerned on the acceptance procedure, etc.)
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VodanIQ s. r. o. | 2 | 2026 |
| Try More, s.r.o. | 1 | 2026 |
| AERZEN SLOVAKIA s.r.o. | 1 | 2025 |
| HYDROEKOL, s.r.o. | 1 | 2026 |
| AB Project, s.r.o. | 1 | 2025 |