Modernization of Pongrácz Road trolleybus depot
Pongrácz úti trolibusz-járműtelep korszerűsítése
Hungary · Budapest · how to bid here →
Your path to submission
- Deadline: 20 October at 11:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (6 awards, most recently June 2026) — the next award is due around December 2026 by that rhythm. The last award went to VÁV UNION Vállalkozási és Szerelési Kft.n = 6
- 16% of this buyer's awards went to companies that had already won here before (187 awards since 2017, spread over 37 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 187 awards since 2017
- The median procedure drew 2 bids (149 procedures with a bid count); 39% ended with a single bidder. Sector: median 5 bids.n = 149
- 24% of awards went to companies from abroad (187 awards with a known winner country). Sector average: 3%.n = 187
- 4% of the bids received came from other countries (67 procedures with a bid mix) — all bidders, not just the winners. Sector: 0%.n = 67
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,299 recorded awards).
Submission language: HUN.
Typical field: median 4 (from 6 awards).
What the buyer is looking for
The contracting authority shall apply Section 58 of Act CXLIII of 2015 on public procurement and Section 322/2015 on the detailed rules for the public procurement of works and design and engineering services related to works. (X. 30.) Government Decree, which contains a summary of the tasks of the construction works and branches, with special regard to the expected quality requirements, mandatory entrepreneurial tasks, and describes the general purpose and function of the construction work, the installation and the special circumstances arising from environmental relations. The construction design documentation shall contain the following sections of the technical design: - architecture - statics - building engineering (gas, heating, water, sewerage, ventilation, external utilities) - building electricity (weak current, strong current, lightning protection) - fire protection - fire alarm…
Show full description
… - acoustics - utility replacements - earth cable network - overhead line The detailed conditions are set out in the procurement technical specifications that are part of the procurement documents.
What you must prove — eligibility criteria
A Kbt. 67. § (1)-(2) bek és 321/2015. (X.30.) Korm. rendelet 1. § (1) bek. alapján ajánlattevőnek - adott esetben kapacitást nyújtó szervezetnek - az EEKD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajánlatkérő e kö… ▸▾
A Kbt. 67. § (1)-(2) bek. és 321/2015. (X. 30.) Korm. rendelet 1. § (1) bek. alapján ajánlattevőnek - adott esetben kapacitást nyújtó szervezetnek - az EEKD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajánlatkérő e … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Telekom Rendszerintegráció Zártkörűen Működő Részvénytársaság | 14 | 2023–2026 |
| FŐMTERV Mérnöki Tervező Zrt. | 6 | 2025–2026 |
| Senso-Media Fejlesztő és Szolgáltató Zártkörűen Működő Részvénytársaság | 5 | 2023–2026 |
| ArrivaBus Korlátolt Felelősségű Társaság | 4 | 2024 |
| Mercarius Flottakezelő Korlátolt Felelősségű Társaság | 3 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.