Delivery of new Christmas decorations for the city of Sliven
„Доставка на нова коледна украса за град Сливен“
Bulgaria · гр.Сливен · how to bid here →
Your path to submission
- Deadline: 29 October at 23:59 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 49% of this buyer's awards went to companies that had already won here before (355 awards since 2017, spread over 141 companies). That is well below the sector norm (80%) — this buyer switches suppliers more often than others.n = 355 awards since 2017
- The award came in at a median 51% of the estimated value (26 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 26
- The median procedure drew 3 bids (307 procedures with a bid count); 35% ended with a single bidder. Sector: median 3 bids.n = 307
- 5% of awards went to companies from abroad (355 awards with a known winner country). Sector average: 0%.n = 355
- Across 13 procedures with structured selection criteria, this buyer most often required: Staff qualifications (11 of 13), Professional liability insurance (11 of 13), References: services (10 of 13), Equipment, plant and technical facilities (3 of 13).n = 13
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Bulgaria · Electrical machinery, 1 contracts went to foreign companies over the last 3 years (of 2,365 recorded awards).
Submission language: BUL.
Typical field: median 3 (from 1,956 awards).
What the buyer is looking for
The selected contractor should deliver new Christmas decorations, including detailed installation instructions. Specific requirements for the potential contractor and the performance of the public contract: 1. Material requirements – described in the Technical Specifications. 1.1. All components of the decoration shall be suitably secured. 1.2. The contractor must repair any damage from the time of installation to the time of dismantling the decoration. Time limit for performance of the contract: until 06.12.2026
What you must prove — eligibility criteria
Всеки участник през последните три години от датата на подаване на офертата следва да е изпълнил поне 1 (една) идентична или сходна дейност - доставка с предмета на поръчката. Забележка: Под „сходна“ услуга с предмета на поръчката е дейности, свързани с достав… ▸▾
Всеки Участникът следва да прилага система за управление на качеството съответстваща на стандарт ISO 9001:2015 или еквивалентни, което се удостоверява със сертификат. Сертификатът трябва да е издаден от независими лица, които са акредитирани по съответната сер… ▸▾
Всеки Участникът следва да прилага система за управление на околната среда съответстваща на стандарт ISO 14001:2015 или еквивалентни, което се удостоверява със сертификат. Сертификатът трябва да е издаден от независими лица, които са акредитирани по съответнат… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| БЕРКО-90 - БЕРКОВСКИ С-ИЕ СД | 11 | 2019–2026 |
| СТЕЛИТ 1 ЕООД | 10 | 2019–2026 |
| КЕЙ ЕНД ВИ ООД | 10 | 2018–2026 |
| ПРЕСТИЖ 2004 ЕООД | 9 | 2024–2026 |
| ПЪТНО ПОДДЪРЖАНЕ-СЛИВЕН ЕООД | 8 | 2018–2025 |