Design Services for the Development of the Technical Project and Execution Details (PT+DE), the specifications for the execution of works, as well as technical assistance from the designer, for the investment objective "RESTORATION OF THE WALLS OF ADA-KALEH FORTRESS", Șimian Island, Șimian village, Șimian commune, Mehedinți County
Servicii de proiectare privind elaborarea Proiectului Tehnic și a Detaliilor de Execuție (PT+DE), a caietului de sarcini pentru execuția lucrărilor, precum și asistența tehnică din partea proiectantului, pentru obiectivul de investiții „RESTAURAREA ZIDURILOR CETĂȚII ADA-KALEH”, insula Șimian, sat Șimian, comuna Șimian, județul Mehedinți
Romania · Drobeta-Turnu Severin · how to bid here →
Your path to submission
- Deadline: 22 October at 15:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (31 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to BEST WORK PROTECTION.n = 31
- 51% of this buyer's awards went to companies that had already won here before (323 awards since 2021, spread over 137 companies). 49% went to new names.n = 323 awards since 2021
- The median procedure drew 3 bids (55 procedures with a bid count); 13% ended with a single bidder. Sector: median 4 bids.n = 55
- 76% of the bids received came from small and medium-sized enterprises (48 procedures with a bid mix). Sector: 90%.n = 48
- 4% of awards went to companies from abroad (323 awards with a known winner country). Sector average: 0%.n = 323
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.
Foreign bidders
In Romania · Architecture & engineering, 84 contracts went to foreign companies over the last 3 years (of 90,802 recorded awards) — mostly from France, Netherlands, Italy.
Submission language: RON.
Typical field: median 4 (from 3,022 awards).
What the buyer is looking for
DESIGN PHASE SUBJECT TO THIS PURCHASE: Technical Project and Execution Details (PT+DE) for Stage I bodies, Specifications for the execution of works and technical assistance from the designer. Implementation of the Technical Project and Execution Details (PT+DE) for the restoration, consolidation and enhancement of the walls of the Ada-Kaleh fortress, certified technical verification of the documentation, specifications for the execution of the works, as well as technical assistance from the designer throughout the execution of the works, the related costs being those provided in the financial offer. STAGE I – TECHNICAL PROJECT AND EXECUTION DETAILS (PT+DE) The technical project will be drawn up in accordance with the provisions of Government Decision No 907/2016, on the basis of and in strict compliance with the technical solutions, Scenario 2 – minimum and the technical-economic…
Show full description
… indicators approved by the IDA, without the need to supplement the quantities of works or modify the planned execution technologies, and without exceeding the approved value. - TECHNICAL VERIFICATION OF THE PROJECT The services of certified technical verification of the technical-economic documentation are an integral part of this acquisition, having an estimated value of 130,000 lei, excluding VAT, according to the general estimate approved by D.A.L.I. The provider has the obligation to ensure, through certified personnel, the technical verification of the documentation at the DTAC, PT and DE phases, as well as during the technical assistance in the execution of the works (Stage III), for all the fundamental requirements applicable to the documentation. - STAGE II – SPECIFICATIONS FOR THE EXECUTION OF WORKS Drawing up the specifications for the execution of . works - STAGE III – TECHNICAL ASSISTANCE FROM THE PROJECTANT The designer has the obligation to respond to the request of the Contracting Authority regarding his presence on the site, to the notification of the Site Manager / Contracting Authority or whenever the situation requires it, as well as to participate, at the request, in meetings with the Site Manager and / or the State Inspectorate in Construction. If the quantities resulting from the measurements differ from those entered in the lists of quantities in the technical documentation, it is necessary to confirm them by the designer, by Site Provision, approved, as the case may be, by the project verifier and the technical expert, and they will be regularized by Order/Dismissal Notes, under the terms of the execution contract. Throughout the execution, until the reception at the end of the works, the designer: - provide solutions for dealing with non-compliances that may have occurred; - respond to the Purchaser's requests to ensure compliance with the project and the required level of quality; - will resolve non-conformities, defects and inconsistencies arising in execution, through technical solutions, with the beneficiary's consent; - will follow, on the construction site, the use in execution of the materials and technologies provided in the project (masonry and mortars compatible with the historical structure). The number of days until which clarifications can be requested before the closing date for submission of tenders/candidates is 20 days. The Contracting Authority will reply once to requests for clarifications on the 11th day before the deadline for submission of tenders.
What you must prove — eligibility criteria
Operatorii economici ce depun oferta trebuie sa dovedeasca o forma de înregistrare în conditiile legii din tara de rezidenta, din care sa reiasa ca operatorul economic este legal constituit, ca nu se afla în niciuna dintre situatiile de anulare a constituirii … ▸▾
Pentru contractele de achizitie de servicii: executarea de servicii de tipul specificat 1. Ofertantul trebuie să facă dovada că în ultimii 3 ani (calculați prin raportare la data limită de depunere a ofertelor) a prestat și dus la bun sfârșit servicii similare… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ULM CART | 20 | 2024–2026 |
| BLUE NEON | 14 | 2024–2026 |
| ROMPETROL DOWNSTREAM | 12 | 2024 |
| DOVALI | 9 | 2024–2026 |
| ROSERVOTECH | 7 | 2024–2026 |
How often this buyer tenders this