Friedrich & ClementBETA

Dublin City Council Single Party Framework Agreement for an Integrated Design Team for the Clontarf Flood Defence and Public Realm Project

Ireland · Dublin · how to bid here →

Your path to submission

  1. Deadline: 30 October at 12:00 — 27 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: ENG.
  4. Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • The award came in at a median 35% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 97%.n = 6
  • In this sector the buyer awards roughly every 2 months (372 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to Jacobs Engineering Ireland Ltd.n = 372
  • 42% of this buyer's awards went to companies that had already won here before (2,598 awards since 2013, spread over 1,261 companies). 58% went to new names.n = 2,598 awards since 2013
  • The median procedure drew 6 bids (2,176 procedures with a bid count); 16% ended with a single bidder. Sector: median 6 bids.n = 2,176
  • 6% of awards went to companies from abroad (2,598 awards with a known winner country). Sector average: 5%.n = 2,598

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.

Foreign bidders

In Ireland · Architecture & engineering, 381 contracts went to foreign companies over the last 3 years (of 8,385 recorded awards) — mostly from United Kingdom, Spain, France.

Submission language: ENG.

Typical field: median 8 (from 308 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The Contracting Authority, Dublin City Council, intends to establish a Single Party Framework Agreement with a Integrated Design Team to deliver planning, engineering, environmental, stakeholder engagement and other specialist consultancy services for the Clontarf Flood Defence and Public Realm Project (CFDPRP). The Project is located along the Clontarf waterfront in Dublin and encompasses a highly sensitive coastal environment adjoining designated European sites, including Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The Project has been initiated to address existing and future coastal and surface water flood risks while delivering a coordinated programme of public realm enhancement, active travel improvements and environmental benefits. The scheme shall be developed through an integrated design approach that balances flood resilience, climate adaptation,…

Show full description

… biodiversity, heritage, placemaking, sustainable mobility, environmental protection and stakeholder aspirations. The initial call-off contract under the Framework will require the successful Applicant to undertake all services necessary to develop the Project from commencement through option identification, scheme development, environmental assessment, statutory consent processes and detailed design. This shall include the preparation of all technical studies, surveys, modelling, assessments, reports, designs and application documentation required to secure the necessary approvals and to progress the Project to a stage suitable for procurement and construction. The Framework Agreement may subsequently be utilised by the Contracting Authority to procure additional related services, including procurement support, construction-stage services, post-consent services and other specialist consultancy services associated with the delivery of the Project. The successful Applicant shall be required to develop a fully integrated and coordinated scheme that delivers flood protection, surface water management, active travel and public realm objectives within a single coherent design solution that is environmentally sensitive, climate resilient and appropriate to the strategic importance of the Clontarf waterfront. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 9181107. Please note that this project is subject to funding.

Description as published (EN).

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.

Eligibility analysis from the tender documents

Contract

BuyerDublin City Council
TypeServices
Estimated value7.500.000 €
Published1 October 2026
CategoryArchitecture & engineering · CPV 71311000

Who has won here before

CompanyAwardsPeriod
Richard Nolan Civil Engineering LTD222020–2024
SIAC Bituminous Products Ltd212016–2024
Cairn Construction192015–2026
Richard Drumgoole Construction Limited152016–2025
Westside Civil Engineering152016–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20197
20203
202113
202216
202328
202460
202564
202633

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 30 October at 12:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →