Procurement of pumping stations (centralization project) for AquaDjurs A/S
Udbud af pumpestationer (centraliseringsprojekt) for AquaDjurs A/S
Denmark · Rønde · how to bid here →
Your path to submission
- Deadline: 2 November at 10:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DAN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 42% of awards went to companies from abroad (12 awards with a known winner country). Sector average: 3%.n = 12
- In this sector the buyer awards roughly every 7 months (3 awards, most recently July 2026) — the next award is due around February 2027 by that rhythm. The last award went to 2Water ApS.n = 3
- 18% of this buyer's awards went to companies that had already won here before (12 awards since 2025, spread over 10 companies). 82% went to new names.n = 12 awards since 2025
- The median procedure drew 5 bids (12 procedures with a bid count); 0% ended with a single bidder. Sector: median 4 bids.n = 12
- The award came in at a median 77% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 92%.n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Denmark · Construction work, 26 contracts went to foreign companies over the last 3 years (of 1,274 recorded awards) — mostly from Belgium, Germany, Bulgaria.
Submission language: DAN.
Typical field: median 3 (from 3 awards).
What the buyer is looking for
The task concerns pump deliveries in connection with AquaDjurs’ overall centralization project in Syddjurs Municipality. The project includes the establishment of a new cutting-off transport system with approximately 95 km of pressure lines, associated pumping stations and pool facilities, as well as the decommissioning of a number of existing wastewater treatment plants. The tendered agreement includes project optimisation, construction design, delivery, execution, testing, documentation, delivery and commissioning of selected large pumping stations and intermediate pumping stations to be carried out as an integral part of the overall transport system. In addition, the work will consist of coordination with existing pump supplier of smaller pumps for use by approx. 6-7 pumping stations. The task is carried out in stages as a main contractor and requires close coordination with the…
Show full description
… contracting authority, general consultant, line contractors, construction contractors, the client's SRO programmer and other suppliers. The contractual basis will consist of an overall cooperation agreement and a conditional main contract, which will be concluded individually per stage. Each stage is divided into phases, where the conditional main contract after the end of phase 3 will be updated and the conditional status will lapse. The contract basis is based on AB18 with the contracting authority's clarifications, and the tenderer's attention is drawn to the fact that the use of persons in training during execution is required. The present call for tenders is made at an extremely early stage of the project with a view to involving future general contractors in the further initial design of the centralisation project. In practice, this will mean that it is currently not possible for the Contracting Authority to determine the types of pump solutions to be offered. Concretization of the service will only take place in step with the further design in collaboration with the future general contractor. It has been established that the future general contractor will provide complete technical solutions for its own services and actively contribute to the clarification of interfaces, system design, hydraulics, control, co-management, working environment, commissioning and future operation based on its project optimization and later detailed project. The invitation to tender shall be conducted by negotiated procedure with prior call for competition, cf. Article 47, cf. Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 (‘the Utilities Directive’). The tendering process consists of a pre-qualification phase as well as a tendering phase, which includes the possibility of several rounds of negotiations, after which the Tenderer will be given the opportunity to submit a final tender.
What you must prove — eligibility criteria
I ESPD´et angives som minimumskrav 4 af de betydeligste tilsvarende/sammen¬lignelige opgaver, som Ansøger har løst, som har været udført indenfor de seneste 5 år beregnet fra tilbudsfristen. Der må således for de enkelte referencer ikke være mere end 5 år mell… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| NIRAS A/S · Allerød | 3 | 2025 |
| 2Water ApS | 1 | 2026 |
| Xylem Water Solutions Denmark ApS | 1 | 2025 |
| Envidan A/S | 1 | 2025 |
| Sweco Danmark A/S | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.