Resilience of the increasing decentralized energy system
Weerbaarheid van het toenemende decentrale energiesysteem
Netherlands · Den Haag · how to bid here →
Your path to submission
- Deadline: 19 October at 12:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (137 awards since 2015, spread over 103 companies). That is well below the sector norm (30%) — this buyer switches suppliers more often than others.n = 137 awards since 2015
- The median procedure drew 5 bids (123 procedures with a bid count); 20% ended with a single bidder. Sector: median 9 bids.n = 123
- 15% of awards went to companies from abroad (137 awards with a known winner country). Sector average: 33%.n = 137
- The award came in at a median 98% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually about right here.n = 5
- 44% of the bids received came from small and medium-sized enterprises (100 procedures with a bid mix). Sector: 52%.n = 100
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Netherlands · R&D services, 177 contracts went to foreign companies over the last 3 years (of 572 recorded awards) — mostly from Belgium, Germany, France.
Submission language: NLD.
Typical field: median 10 (from 7 awards).
What the buyer is looking for
The Client wishes to contract a Contractor who carries out research into the resilience of the increasing decentralised energy system and its significance for the integrated energy system. The assignment focuses on developing a coherent picture of the resilience of decentralised energy systems. It examines how resilience can be defined, assessed and strengthened, and under which conditions decentralised energy systems can contribute to the resilience of the energy system as a whole. The assignment includes at least the development of a conceptual framework, an assessment framework, an analysis of risks and impact scenarios, measures to increase resilience, and action perspectives for policy, innovation and practice. See tender document
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| LightCastle Partners | 3 | 2025–2026 |
| Brandwise B.V. | 3 | 2025 |
| HaskoningDHV Nederland BV | 2 | 2015 |
| Haskoning Nederland B.V. | 2 | 2025 |
| 10BE B.V. | 2 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.