Design and construction of two 10kV purchasing stations in Westerhoven and Helmond
Ontwerp en realisatie van twee 10kV inkoopstations in Westerhoven en Helmond
Netherlands · 's-Hertogenbosch · how to bid here →
Your path to submission
- Deadline: 21 October at 10:00 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 5% of this buyer's awards went to companies that had already won here before (314 awards since 2015, spread over 143 companies). 95% went to new names.n = 314 awards since 2015
- The median procedure drew 4 bids (278 procedures with a bid count); 13% ended with a single bidder. Sector: median 3 bids.n = 278
- The award came in at a median 82% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here.n = 5
- 11% of awards went to companies from abroad (314 awards with a known winner country). Sector average: 14%.n = 314
- 26% of the bids received came from small and medium-sized enterprises (145 procedures with a bid mix). Sector: 28%.n = 145
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Netherlands · Electrical machinery, 26 contracts went to foreign companies over the last 3 years (of 209 recorded awards) — mostly from Germany, Italy, France.
Submission language: NLD.
Typical field: median 3 (from 158 awards).
What the buyer is looking for
The services consist of the following: designing and fully realizing two accessible MS purchasing stations, including separate customer space and medium voltage (MS) switches at 2 locations in southeast Brabant for the future supply of charging squares for electric buses. Two purchasing stations.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Tauw BV | 4 | 2024–2026 |
| Axians Communication Solutions B.V. | 2 | 2025 |
| Witteveen+Bos Raadgevende ingenieurs B.V. | 2 | 2025–2026 |
| Antea Nederland B.V. | 2 | 2025–2026 |
| Movares Nederland B.V. | 2 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.