ŽSR, ETCS L2 in the section ŽST Ľubochňa - ŽST Liptovská Teplá (excluded)
ŽSR, ETCS L2 v úseku ŽST Ľubochňa - ŽST Liptovská Teplá (mimo)
Slovakia · Bratislava · how to bid here →
Your path to submission
- Deadline: 18 November at 10:00 — 46 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (23 awards, most recently April 2026) — by that rhythm the next award was due around July 2026. The last award went to TRANSSERVIS, a.s. Košice.n = 23
- 15% of this buyer's awards went to companies that had already won here before (202 awards since 2019, spread over 66 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 202 awards since 2019
- The median procedure drew 2 bids (181 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 181
- The award came in at a median 90% of the estimated value (24 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 24
- 90% of the bids received came from small and medium-sized enterprises (97 procedures with a bid mix). Sector: 79%.n = 97
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Slovakia · Construction work, 80 contracts went to foreign companies over the last 3 years (of 1,102 recorded awards) — mostly from Germany, Czechia, Italy.
Submission language: SLK.
Typical field: median 3 (from 23 awards).
What the buyer is looking for
The subject-matter of the contract, entitled ‘ŽSR, ETCS L2 in the section Ľubochňa - ŽST Liptovská Teplá (outside)’, is: - preparation and delivery of project documentation at the stage of construction plan and construction project in the details of the implementation project, including geodetic focus, - provision of related engineering activities, the result of which will be to ensure a final decision on the construction plan and verification of the construction project (including ensuring the extension of their validity if necessary; and, in the event that the decision on the construction plan ceases to be valid, to ensure the issuance of a new final decision on the construction plan and the verification of the construction project); - to ensure the property-legal settlement of landowners in the form of a permanent scope or the establishment of an easement, in the course of the…
Show full description
… procedure on the construction plan, or, in the case of newly identified owner(s), on the date of submission of the application for approval of the construction, if necessary; - to carry out construction works; - to ensure the related engineering activity during the execution of construction works, the result of which will be the provision of a final approval certificate or final approval certificates; - to prepare and deliver project documentation on the actual construction of the construction (hereinafter also referred to as the ‘subject of the contract’ in the relevant grammatical form). The contract is awarded on the basis of the task of Resolution of the Government of the Slovak Republic No 604/2025 of 3 December 2025 on the draft Action Plan for improving railway safety in Slovakia. The aim is to implement and implement the ETCS L2 BL3 system or higher version in the Varín - Výh railway station section. Paludza in parts of ŽST Varín (outside) - ŽST Vrútky skl. st., ŽST Vrútky skl. st. (outside) - ŽST Ľubochňa (outside), ŽST Ľubochňa - ŽST Liptovská Teplá (outside), ŽST Liptovská Teplá - Výh. Paludza, including integration into existing station and line safety equipment, telecommunications infrastructure and traffic control systems for traffic control personnel. This contract concerns part of ŽST Ľubochňa - ŽST Liptovská Teplá (outside). At present, on the section of the Ľubochňa - Liptovská Teplá railway station line (outside) in Lisková railway station, Ružomberok railway station, the security device is relayed. In Ľubochňa railway station, the security device is electromechanical with light signals and electromotor switches for controlling switches, with a relay part operated by local dispatchers. On the section of the line Ružomberok - Ľubochňa, the one-way relay automatic block is decentralised, and on the section of the line Ružomberok - Lisková - Liptovská Teplá, the two-way relay automatic block is centralized. In carrying out the subject-matter of the contract, the contracting entity shall require that ETCS L2 BL3 or higher be designed in the existing railway infrastructure in such a way that it requires only the necessary interventions on the existing railway network and its technological equipment. The guiding principle is to make maximum use of existing infrastructure and existing security devices, with new technological elements of ETCS L2 BL3 or higher being integrated in a way that minimises structural modifications and operational constraints. The proposed solution is to ensure the implementation of ETCS L2 BL3 or higher with ETCS backward compatibility of lower versions of BL2 and BL3 in accordance with the interoperability requirements of the currently applicable CCS TSI, while limiting the scope of construction and technological modifications to those that are necessary for the functionality of the ETCS system, in particular the installation of trackside elements, the establishment of control components and the provision of data communication. The proposed ETCS technology L2 BL3 or higher shall fully respect and take into account current station alarms, track-side alarms, level crossing alarms. In the design and implementation of the subject-matter of the contract, emphasis must be placed on maintaining the continuity of railway operations, minimising interventions in existing infrastructure and optimising investment costs while achieving the required level b
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| TSS GRADE, a.s. | 6 | 2024–2025 |
| Alanata a. s. | 5 | 2024–2026 |
| DIPRO Consult, s.r.o. | 4 | 2024–2026 |
| InterWay, a. s. | 3 | 2023 |
| TEMPRA, s.r.o. | 3 | 2024–2025 |
How often this buyer tenders this