Execution of repairs to HKV series 361 and 362 and their main aggregates
Vykonávanie opráv HKV radu 361 a 362 a ich hlavných agregátov
Slovakia · Bratislava · how to bid here →
Your path to submission
- Deadline: 3 November at 09:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLK, CES, SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (26 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to RUDOS RUŽOMBEROK , s.r.o..n = 26
- 19% of this buyer's awards went to companies that had already won here before (302 awards since 2017, spread over 72 companies). That is well below the sector norm (45%) — this buyer switches suppliers more often than others.n = 302 awards since 2017
- The median procedure drew 2 bids (258 procedures with a bid count); 45% ended with a single bidder. Sector: median 1 bids.n = 258
- The award came in at a median 100% of the estimated value (35 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 91%.n = 35
- 29% of awards went to companies from abroad (302 awards with a known winner country). Sector average: 23%.n = 302
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Slovakia · Repair & maintenance, 39 contracts went to foreign companies over the last 3 years (of 421 recorded awards) — mostly from Czechia, Poland, France.
Submission language: SLK.
Typical field: median 1 (from 26 awards).
What the buyer is looking for
The subject of the contract is the performance of repairs of traction units of the 361, 362 series and their main aggregates (hereinafter referred to as the 361, 362 series main aggregate). Repairs means the execution of the Basic scope of works and Related works and Related works awarded by the standard-hour according to the requirement of the contracting entity.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ŽOS Trnava, a.s. | 8 | 2024–2026 |
| RUDOS RUŽOMBEROK , s.r.o. | 8 | 2024–2026 |
| ŽOS Vrútky a.s. | 7 | 2024–2025 |
| Železničné opravovne a strojárne Zvolen, a.s. | 5 | 2024–2025 |
| SMART CORPORATION, s. r. o. | 5 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.