Establishment of Military Loading Facilities
Katonai rakodók létesítése
Hungary · Budapest · how to bid here →
Your path to submission
- Deadline: 6 November at 12:00 — 33 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN, HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 9% of this buyer's awards went to companies that had already won here before (397 awards since 2018, spread over 62 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 397 awards since 2018
- The median procedure drew just one bid (356 procedures with a bid count); 60% ended with a single bidder. Sector: median 5 bids.n = 356
- 20% of awards went to companies from abroad (397 awards with a known winner country). Sector average: 3%.n = 397
- Across 8 procedures with structured selection criteria, this buyer most often required: References: supplies (6 of 8), References: services (1 of 8), Staff qualifications (1 of 8).n = 8
- 76% of the bids received came from small and medium-sized enterprises (99 procedures with a bid mix). Sector: 68%.n = 99
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,299 recorded awards).
Submission language: HUN.
Typical field: median 8 (from 3 awards).
What the buyer is looking for
Precise description of the procedure: In 2019, NATO and the European Union concluded an agreement on military mobility, according to which new planning guidelines are in place. It is also in this spirit that loading facilities and railway tracks that meet military requirements must be constructed on the railway section subject to the procedure. The contracting authority shall provide for the possibility of sub-tendering as follows: Part 1: Free accommodation at a railway station construction of a military loader: Quantity: -886 vfm track construction; -1 detour construction; -1 2 track front loader construction; -Construction of 16 square lighting columns; -1 preparation of organizational plan documentation, -1 preparation of implementation plan documentation Part 2: Construction of a military loader at Kiskunlacháza railway station: - 787 vfm track construction; - 1 detour construction;…
Show full description
… - 2 pcs 1 track front loader construction; - Preparation of 1 organisational plan documentation, - Preparation of 1 implementation plan documentation The contracting authority wishes to conclude business contracts separately for each part. The detailed task description and the information on the total quantity are included in the technical specifications, design documentation and unpriced budget provided as part of the KD. Decision No 321/2015 of the European Parliament and of the Council of 16 December 2015 (X.30.) In view of the provisions of Section 46(3), AK draws attention to the fact that, with regard to both parts, if the clear and comprehensible definition of the subject-matter of the public procurement made it necessary to refer to a specific make, origin, type of thing, procedure, activity, person, patent or trademark, the designation was made only in order to clearly determine the nature of the subject-matter, and in addition to the designation, ‘or equivalent’ must always be understood. During the assessment of the technical content, equivalence shall be judged by the Contracting Authority, for the decision of which all data shall be provided by the Tenderer. It is therefore the responsibility of the tenderer to prove in the tender that the goods offered are equivalent to the product specified by the Contracting Authority. Due to character limitation VI.3) Continuation of further information: 30. Tangible works under Decree No 707/2021. (XII. 15.) is subject to the Government Decree, so AT is obliged to declare in its tender that it has become familiar with the requirements for the use of the Glass Gate, and the contracting party as the winning AT is obliged to apply the Glass Gate during the performance of the contract. 31. Detailed rules of the liability insurance contract: By signing this contract, the Contractor declares that he has - or has extended - a construction-installation (C.A.R.= "ConstructionAllRisks") insurance, including valid liability insurance for the work that is the subject of the contract, as required as a condition of the contract, the minimum compensation limit of which is Chapter II liability insurance: HUF 500,000,000 / insurance event and HUF 500,000,000 / insurance period. If the contract does not enter into force in accordance with point 3.1(a) of the contract, the Contractor shall provide the Customer with a copy of the fee and damage certificate issued by the insurance company within 10 working days of receipt of the Customer’s notification in accordance with point 3.1(b). Failure to comply with this deadline for reasons for which the Contractor is responsible shall be considered a serious breach of contract. 32. Documents AK a Kbt. With regard to Section 39(1), it shall be made available without restriction and in full, directly and free of charge, by electronic means at the address specified in Section I.3). In view of the large volume of documentation, AK used the 7-Zip program to split Volume V of the Public Procurement Documents into files of the size that could be uploaded in both parts. Please download the uploaded files to a folder and then extract them with the free 7-Zip program: “V Volume.7z.001” → Right Mouse Button → 7-Zip → Files Off
What you must prove — eligibility criteria
A 321/2015. (X. 30.) Korm. rendelet 21. § (2) bekezdés b) pontja szerint alkalmas az ajánlattevő, ha rendelkezik a teljesítésbe bevonni kívánt, az alábbiakban megjelölt szakemberekkel: M.1. legalább 1 fő szakemberrel, aki rendelkezik a 266/2013. (VII. 11.) Kor… ▸▾
M/1. és M/2. alkalmassági követelmény igazolásának folytatása karakter korlát miatt: 2: abban az esetben, ha az alkalmasság igazolásában részt vevő szakemberek az ajánlattételkor már rendelkeznek kamarai jogosultsággal és a jogosultság megszerzését követő idős… ▸▾
A 321/2015. (X. 30.) Korm. rendelet 21. § (2) bekezdés b) pontja szerint alkalmas az ajánlattevő, ha rendelkezik a teljesítésbe bevonni kívánt, az alábbiakban megjelölt szakemberekkel: M.1. legalább 1 fő szakemberrel, aki rendelkezik a 266/2013. (VII. 11.) Kor… ▸▾
M/1. és M/2. alkalmassági követelmény igazolásának folytatása karakter korlát miatt: 2: abban az esetben, ha az alkalmasság igazolásában részt vevő szakemberek az ajánlattételkor már rendelkeznek kamarai jogosultsággal és a jogosultság megszerzését követő idős… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| VAMAV Vasúti Berendezések Korlátolt Felelősségű Társaság | 9 | 2022–2024 |
| HAMER Spol. s.r.o | 5 | 2023–2024 |
| E-LANDIA Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság | 5 | 2022–2023 |
| voestalpine Rail Technology GmbH · Leoben | 5 | 2021–2024 |
| PARTNER CABLE ZRT. | 4 | 2023–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.