NyMJV TOP_PLUSZ-132_00018 Design Services
NyMJV TOP_PLUSZ-132_00018 Tervezési szolgáltatások
Hungary · Nyíregyháza · how to bid here →
Your path to submission
- Deadline: 14 October at 13:00 — 11 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (71 awards since 2018, spread over 14 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 71 awards since 2018
- The median procedure drew 4 bids (62 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 62
- 11% of awards went to companies from abroad (71 awards with a known winner country). Sector average: 4%.n = 71
- Across 49 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (40 of 49), References: services (38 of 49), Technical staff for execution (31 of 49), Technical staff for quality control (11 of 49).n = 49
- 82% of the bids received came from small and medium-sized enterprises (17 procedures with a bid mix). Sector: 90%.n = 17
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Hungary · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 1,101 recorded awards) — mostly from Germany, United Kingdom, France.
Submission language: HUN.
Typical field: median 12 (from 6 awards).
What the buyer is looking for
In relation to project TOP_PLUSZ-1.3.2-23-NY1-2025-00018 entitled ‘Development of internal roads in Nyíregyháza Phase IX’, planning works related to the development of infrastructure in Nyíregyháza public administration areas: Licensed plan; Preparation of implementation plan and execution of design management tasks; technical support for public procurement procedures for related works.
What you must prove — eligibility criteria
M1) Alkalmatlan AT, amennyiben nem rendelkezik min. 1 db, az AF feladását megelőző 36 hónapban teljesített és legalább 72 hónapban megkezdett, ENGEDÉLYES TERV és/vagy KIVITELI TERV és/vagy TENDER TERV készítési és/vagy felülvizsgálatára és/vagy módosítására vo… ▸▾
M2) Alkalmatlan AT, amennyiben nem állnak rendelkezésére az alábbi előírásoknak megfelelő, a 266/2013. (VII.11.) Korm. rendelet (tovább. Korm. r.) alábbi pontjában meghatározott, alábbi szakterületen tervezői jogosultság megszerzéséhez szükséges képzettséggel … ▸▾
A szakmai tevékenység végzésére vonatkozó alkalmasság minimumkövetelménye: SZ/1. AT (közös ATk) alkalmatlan, ha nem szerepel a tervezői szolgáltatás tárgya szerint illetékes országos szakmai kamara által vezetett névjegyzékében, illetve a nem Magyarországon le… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| KE-VÍZ 21 Építőipari zártkörűen működő Részvénytársaság | 3 | 2024–2026 |
| Mészáros és Mészáros Ipari, Kereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság | 2 | 2024–2025 |
| Planet Concept Kft. | 1 | 2025 |
| Geomagnetic General Kft | 1 | 2025 |
| Belfry PE Korlátolt Felelősségű Társaság | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.