Selection of a contractor for the preparation of a compliance assessment of an investment project and the exercise of construction supervision for the object: "Reconstruction of a pressure water pipeline from PS "Eastern Zone" to NR 4,000 m³ in the city of Haskovo"
„Избор на изпълнител за изготвяне на оценка на съответствие на инвестиционен проект и упражняване на строителен надзор за обект: „Реконструкция на напорен водопровод от ПС „Източна зона“ до НР 4 000 м³ в гр. Хасково“
Bulgaria · гр. Хасково · how to bid here →
Your path to submission
- Deadline: 4 November at 23:59 — 33 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (175 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to ЕКИП - МГ ООД.n = 175
- 66% of this buyer's awards went to companies that had already won here before (639 awards since 2016, spread over 187 companies). 34% went to new names.n = 639 awards since 2016
- The median procedure drew 2 bids (517 procedures with a bid count); 30% ended with a single bidder. Sector: median 2 bids.n = 517
- The award came in at a median 85% of the estimated value (115 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 115
- 0% of the bids received came from small and medium-sized enterprises (194 procedures with a bid mix). Sector: 13%.n = 194
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Bulgaria · Architecture & engineering, 6 contracts went to foreign companies over the last 3 years (of 12,479 recorded awards).
Submission language: BUL.
Typical field: median 3 (from 139 awards).
What the buyer is looking for
The subject of this public contract is the selection of a contractor with professional qualifications and practical experience in the exercise of consultancy services within the meaning of Article 166(1)(1) of the Spatial Planning Act (ZUT), namely the preparation of an assessment of the compliance of the investment project with the basic requirements for construction works and the exercise of construction supervision on a site: “Reconstruction of a pressure water pipeline from the East Zone PC to the 4 000 m3 HP in the town of Haskovo”, to ensure the lawful implementation of the construction, including the exercise of investor control during the implementation of the construction works, the performance of the functions of a safety and health coordinator, the preparation of a final report, a technical passport, geodetic surveying to provide a Certificate from the AGCC under Article 54a…
Show full description
… of the Cadastre and Property Register Act (CRA), as well as all the necessary documents for the issuance of a Permit for Use. The Contractor is responsible for his activities and obligations as a participant in the construction process, regulated in Articles 166 and 168 of the Spatial Development Act. The subject of this public contract is the selection of a contractor with professional qualifications and practical experience in the exercise of consultancy services within the meaning of Article 166(1)(1) of the Spatial Planning Act (ZUT), namely the preparation of an assessment of the compliance of the investment project with the basic requirements for construction works and the exercise of construction supervision on a site: “Reconstruction of a pressure water pipeline from the East Zone PC to the 4 000 m3 HP in the town of Haskovo”, to ensure the lawful implementation of the construction, including the exercise of investor control during the implementation of the construction works, the performance of the functions of a safety and health coordinator, the preparation of a final report, a technical passport, geodetic surveying to provide a Certificate from the AGCC under Article 54a of the Cadastre and Property Register Act (CRA), as well as all the necessary documents for the issuance of a Permit for Use. The Contractor is responsible for his activities and obligations as a participant in the construction process, regulated in Articles 166 and 168 of the Spatial Development Act.
What you must prove — eligibility criteria
Участникът трябва да е вписан в регистъра за упражняване на дейностите по чл.166, ал.1, т.1 от ЗУТ. Участникът трябва да притежава валидно удостоверение/лиценз за извършване на дейностите, съгласно Наредба РД-02-20-25/03.12.2012г. за условията и реда за издава… ▸▾
Участникът трябва да има валидна застраховка „Професионална отговорност“, съгласно чл. 171 от ЗУТ, във връзка с чл. 5, ал. 3 и ал. 4 от НАРЕДБА за условията и реда за задължително застраховане в проектирането и строителството/или еквивалентен документ за чужде… ▸▾
Участниците следва да са изпълнили услуга с предмет и обем, идентичен или сходен с тези на поръчката за последните 3 (три) години от датата на подаване на офертата. Минимално изискване: Участникът трябва да е изпълнил най-малко 1 (една услуга) с предмет и обем… ▸▾
Участникът трябва да разполага с персонал и/или с ръководен състав с определена професионална компетентност за изпълнението на поръчката. Минимално изискване: Изискване за минимален брой експерти/специалисти, които ще отговарят за изпълнението на обществената … ▸▾
Участниците трябва да са сертифицирани в областта на предмета поръчката по стандарт EN ISO 9001:2015 Системи за управление на качеството за дейностите или еквивалентен. Минимално изискване: Участниците трябва да са сертифицирани в областта на дейности, свързан… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ЕВРОПЪТ 2005 ООД | 36 | 2023–2026 |
| АТА-СТРОЙ ЕООД | 34 | 2021–2026 |
| ГАРАНТ - 2000 ООД | 31 | 2021–2026 |
| ЕН АР КОНСУЛТ ЕООД | 21 | 2016–2026 |
| РАДЕВ -06 ЕООД | 21 | 2021–2026 |
How often this buyer tenders this